Jack Foot 8" Tall with Snapper Pin

Min.Order: 500
Product origin: Ningbo, Zhejiang, China
Infringement complaint: complaintComplaint
US$ 30

Description

Product description

Product name

Trailer Parts

Color

Buyer's requirements

Structure

Welding parts

Material

Steel

Surface treatment

Powder Coated

Usage

mounting

Certification

ISO 9001, TS16949

Application

Outdoor




        Ningbo Yinzhou Hishen Hardware Co.,Ltd. stands on the beautiful and rich Orient Port ----Ningbo city, Zhejiang province, nearby Beilun port, train station and high speed way provide a prerequisite for convenient transportation!

         The company established in 2006 , specialize in all kinds of sheet metal fabrication , cnc machining parts , welding parts , stamping parts , tube bending parts and so on . Possess good sustainable development

         infrastructure and strain capacity for quick response to market demand . We carry out ISO9001 Quality Control System in our management .




Quality Control




Packaging & Shipping











Our Team








Our Service

1. OEM/ODM Services, We have engineers to design as buyer's requirements.
2. Specialized in manufacture metal products, the factory equipped with Cutting machines, punch machines with 10T-60T, plate cutting machines, pipe bending machines, roll bending machine, drilling machine, milling machine, lathe, grander machine, Co2 and argon-arc welding machines, etc.
3. 450m long all automatized metal surface processing plant, all automatized oil wash, rust removing, powder coating, curving, water wash, drying, and other procedures.

FAQ
Q: Are you trading company or manufacturer ?

A: We are factory with ISO  and TS certificate .

Q: How long is your delivery time ?

A: Normaly 30days but it dpends on  . For laser cutting  parts , we can supply it within  10days ,for sheet metal fabrication we can catch  up within 25days . We will always try  our best to  meet customer's requirment if there is urgency .

Q: Do you provide samples ? Is it free ?

A: Yes , we can offer samples for free if there is no jigs or toolings needed in the production .

Q: What is your payment terms ?

A: Usually we do at 30% TT  as deposit  with  full tooling cost if there is , and the balanace to be paid before shipment after approval of quality . But we  also can offer better terms after we start cooperation  while we have  more know about each other .

 

 

Product Tag:
Related categories:
Scroll to Top