Prefabricated Steel Structure Building From China with Professional Design

Min.Order: 500
Product origin: Weifang, Shandong, China
Infringement complaint: complaintComplaint
US$ 35 ~ 45

Description
Prefabricated Steel Structure Building/Workshop/Warehouse/Construction Building From China with Professional Design




Production Description

 
No. Item NameDescription
1Main Steel MemberMain Steel FrameQ345B Welding H Beam
2StairsChannel Steel
3PurlinPurlinGalvanized C-Steel
4Secondary Steel MemberYC-Verge AngleAngle Steel 
5XG-tieRound Tube
6Roof&Window BracingRound Steel
7Floor Deck 
8PanelSea-blue Roof PanelRock Wool Colour Steel Composite Plate
9White-gray Wall Panel
10Maintenance MaterialsRoof Panel Edges Trim, Outer Ridge Tile, Outside Corner 90º, Dado Flashing, Door Trim, Windows Trim, Outside Gutter, Downspout, Floor Deck Trim
11Door Composite Plate Door
12Widows Aluminum Alloy Window
13Install Accessories

Project Show







Our Factory

     
      Gaomi Wantai Steel Structure Engineering Co., Ltd has been specialized in designing and manufacturing steel structure buildings, workshops, bridges and all kinds of steel structure projects for 12 years. Our factory covers an area of 260, 000 square meters and exports 50,000 tons of steel structure per year. We have got ISO9001:2015, ISO14001:2015, SGS and BV Certification. With rich experience, professional engineers, advanced technology and excellent after-sale services, Wantai has always won great domestic and abroad markets. The perfect combination of first-class talents and equipment makes Wantai a leading enterprise in steel structure industry.







Certification



Our Service 

 Delivery:Usually, within 45-60 days after the order confirmed. It depends on the fabrication quantity.

Installation:
  1. After production, we will supply steel building installation drawing.
  2. Send techinican to guide installation on site if customer request.

Int'l Trade team:

We have six internatioanl trade businessman onlines 24 hours.

Maintenance:
 Finish paint need be done after the frame installed, and do it again after 6-8 months.
So the surface will stay more time.

International Projects:







Product Tag:
Related categories:
Scroll to Top