Spring Steel Flat Torsion Latch Spring

Min.Order: 1,000
Product origin: Xiamen, Fujian, China
Infringement complaint: complaintComplaint
US$ 0.005 ~ 0.995

Description
ItemISO Certificated Customized Torsion Spring With Different Shape
Wire Diameter0.1mm-8mm
Inside Diameter>=0.3 mm
Outside Diameter>=0.5 mm
Total Coils>=1
MaterialStainless Stee(SUS), Spring Steel(SWC), Music Wire(SWP), Mild-Carbon Steel, Phosphor Copper, Beryllium Copper, Brass, Aluminum, Alloy Steel etc.
DimensionsCustomized
Surface TreatmentZinc, Nickel, Chrome, Tin, Silver, Copper, Gold,  Dacromet Plating, Blacking, E-coating, Powder coating etc
Samples Time3-5 Working Days
Delivery Time10-25 Days
ExperienceMore than 20 years manufacture experience of springs, wire forms and stamping parts
Payment TermsT/T, West Union, Alibaba Trade Assurance Order
CertificationISO9001:2015, SGS, Rohs
PackagePE Bag + Carton

FAQ
 
Q: Are you trading company or manufacturer?

A: We are the factory by SGS authenticated.

Q. When can I get the price?
 
A: We usually quote within 24 hours after we got your inquiry. If you are very urgent to get the price, please call us or contact us by email.

Q: How can I get the quotation?

A: Please send us information for quote: drawing, material, weight, quantity and request, we can accept PDF, ISGS, DWG, STEP file format. If you don't have drawing, please send the sample to us, we can quote based on your sample too.

 Q. Do you accept the OEM?

 A: OEM is welcome. We can custom the goods according to your design . 
 
Q. What is the shipping?

 A: By express(FedEx, UPS, DHL, TNT, EMS, etc...), By Air and By Sea.
 
Q. How do I pay for the order?

 A: The common payments are T/T(Telegraphic Transfer), Western Union, Alibaba Assurance Trade.
 
Q. I have an idea for a new product, but don't know if it can be manufactured. Can you help?

A: Yes, it is our pleasure to work with potential customers to evaluate the technical feasibility of your idea or design, and we can advise on materials, tooling and so on.
 
Q: What's your MOQ?

A: In general 1000pcs,but can accept low quantity in some special conditions.

Q: What about the leading time for mass production?

A: Honestly, it depends on the order quantity. Normally, 7 days to 25 days after receiving your deposit.

Q: How if the parts are not good?

A: We can guarantee good quality, but if happened, please contact us immediately and take pictures for us, we will check on the problem and solve it ASAP.

                                                                                                                             
Product Tag:
Related categories:
Scroll to Top