Feature
1.Magnetic route is short, magnetic waste less, the gradient is high and removing iron efficiently.
2.Light weight, compact cooling structure and high heat-releasing efficiently.
3. Absorbing the advanced oil forced circulation technology for the large or medium transformer both home and abroad, it features
with low temperature rising (≤50ºC) and the technology is reliable and safety.
4. The exciting coil is completely dipped into the transformer oil to be dustproof, moisture-proof and anti-corrosion.
5. Made three-dimensional excitation coil winding, the area for heat releasing is large to control the temperature rise (≤50ºC) for long service life.
6. Easy maintenance, the drum shape structure, special designed wholly sealed structure to help the equipment run in harsh environments.
No. | Model | conveyor belt width (mm) | Suspension height(h=mm) | Magnetic intensity(≥mt) | Belt speed(m/s) | Existing power (≤kw) | Condenser power (≤kw) | Weight(kg) | Appearance size (mm) | |
1 | RCDEQ-10 | T1 | 1000 | 300 | 90 | ≤5.8 | 6.5 | 0.25 | 3450 | 2960×1620×1480 |
T2 | 120 | 9.5 | 0.25 | 3820 | 2960×1620×1520 | |||||
T3 | 150 | 15.0 | 0.25 | 4500 | 3000×1620×1550 | |||||
2 | RCDEQ-12 | T1 | 1200 | 350 | 90 | 9.0 | 0.25 | 3850 | 3250×1770×1520 | |
T2 | 120 | 14.0 | 0.25 | 4620 | 3350×1770×1590 | |||||
T3 | 150 | 20.0 | 0.25 | 6600 | 3520×1770×1590 | |||||
3 | RCDEQ-14 | T1 | 1400 | 400 | 90 | 14.0 | 0.25 | 4650 | 3350×1750×1550 | |
T2 | 120 | 20.0 | 0.25 | 6780 | 3520×1860×1590 | |||||
T3 | 150 | 29.0 | 0.25 | 8560 | 3630×1860×1620 | |||||
4 | RCDEQ-16 | T1 | 1600 | 450 | 90 | 18.0 | 0.25 | 5760 | 3520×1850×1590 | |
T2 | 120 | 28.0 | 0.25 | 8920 | 3750×2250×1620 | |||||
T3 | 150 | 32.0 | 0.25 | 10200 | 3950×2250×1630 | |||||
T4 | 175 | 52.0 | 0.75 | 12300 | 4120×2470×1750 | |||||
T5 | 200 | 70.0 | 0.75 | 14375 | 4170×24700×1750 | |||||
T6 | 225 | 85.0 | 1.1 | 16730 | 4230×24900×1800 | |||||
T7 | 250 | 104.0 | 0.55×2 | 18250 | 4350×25300×1860 | |||||
5 | RCDEQ-18 | T1 | 1800 | 500 | 90 | 26.0 | 0.75 | 8800 | 3950×2250×1630 | |
T2 | 120 | 32.0 | 0.75 | 10500 | 3950×2450×1650 | |||||
T3 | 150 | 40.0 | 0.75 | 12500 | 4000×2450×1670 | |||||
T4 | 175 | 56.0 | 0.75 | 18560 | 4240×2500×1800 | |||||
T5 | 200 | 75.0 | 0.75 | 20754 | 4300×2520×1850 | |||||
T6 | 225 | 90.0 | 1.1 | 22500 | 4300×2580×1900 | |||||
T7 | 250 | 107.0 | 0.55×2 | 23500 | 4400×2650×1950 | |||||
6 | RCDEQ-20 | T1 | 2000 | 550 | 90 | 30.0 | 0.75 | 11650 | 3950×2450×1650 | |
T2 | 120 | 39.0 | 0.75 | 13500 | 4100×2680×1670 | |||||
T3 | 150 | 41.0 | 0.75 | 15200 | 4620×2680×1670 | |||||
T4 | 175 | 70.0 | 0.55×2 | 24580 | 4400×2680×1830 | |||||
T5 | 200 | 83.0 | 0.55×2 | 25435 | 4470×2700×1900 | |||||
T6 | 225 | 104.0 | 0.55×2 | 27890 | 4520×2730×2150 | |||||
T7 | 250 | 125.0 | 0.55×2 | 29500 | 4600×2800×2250 | |||||
7 | RCDEQ-22 | T1 | 2200 | 600 | 90 | 39 | 0.75 | 13200 | 4100×2680×1670 | |
T2 | 120 | 42 | 0.75 | 16500 | 4260×2750×1690 | |||||
T3 | 150 | 45 | 0.75 | 17260 | 4500×2750×1690 | |||||
T4 | 175 | 100 | 0.55×2 | 28750 | 4650×2850×2200 | |||||
T5 | 200 | 121 | 0.55×2 | 30445 | 4700×2900×2300 | |||||
T6 | 225 | 153 | 0.55×2 | 32270 | 4780×2900×2300 | |||||
T7 | 250 | 176 | 0.55×2 | 34100 | 4830×2950×2370 | |||||
8 | RCDEQ-24 | T1 | 2400 | 650 | 90 | 40 | 0.75 | 16800 | 4260×2750×1690 | |
T2 | 120 | 46 | 0.75 | 18500 | 4500×2750×1690 | |||||
T3 | 150 | 54 | 0.75 | 22000 | 4800×2950×1720 | |||||
T4 | 175 | 120 | 0.55×2 | 34750 | 4600×2850×2100 | |||||
T5 | 200 | 150 | 0.55×2 | 37680 | 4700×2950×2280 | |||||
T6 | 225 | 180 | 0.55×2 | 40585 | 4850×3000×2430 | |||||
T7 | 250 | 200 | 1.1×2 | 44500 | 4950×3100×2560 |
Dimension drawing:
1.Pre-sale services: enthusiasm
We provide you with the prophase plan, process flow design and manufacturer equipment according to your special demand.
2.one-year warranty to make sure your machine runs consistently.
We always offering lifelong services and provide spare parts for a long term,and repair main parts under right using for free in two years.
3.Technical services
3.1 Design of production line and solutions according to buyer's requirement.
3.2 In 7 days after the receipt of deposit, the seller shall provide related technical documents for equipment installation, in addition to those with special requirements.
3.3 Before delivery, the seller can modify the previous solutions according to buyer's requirement.
4.After-sales service
4.1 During the installation and commissioning, the seller shall send technician to the site for instruction of installation and commissioning, and for training of workers.
4.2 If there is any equipment failure caused by the buyer, the seller shall assist the maintenance of machines and replacement of fittings, and charges appropriate fees.
4.3 Beyond the guarantee period, the seller can provide services and fittings at a most preferential price.
4.4The seller can provide consultation and inspection services freely for other products, especially for the up-stream and down-stream products of our equipment.
A: Yes, we can help you combine a complete mineral processing line. and give you related professional advice as long as you need.
There is a rich experience engineer team of us. we had already build many mining projects in China & Overseas. You can believe our quality and service.
Welcome Inquiry & we will reply to you within 24 hours.