Model NO. | 30T |
Application Area | Construction industry |
Specification | Φ3mx5.3m |
volume | 22m³ |
weight | 30T |
Origin | China |
Cement bin (also called cement tank) is generally used in the bulk cement storage of concrete mixing station, cement tank is a kind of closed storage of bulk materials tank suitable for storing cement, fly ash and other bulk building materials, tank is equipped with material level system, can show the location of the material and how much, the hole device can remove the material deposition too long caused by strong. Cement bin and screw pump can be used together to transport materials to each location, the tank is easy to install, safe and reliable is the ideal bulk storage tank for a variety of mixing stations.
Construction industryCement tank (also called bulk cement tank, cement bin) is generally used in the bulk cement storage of concrete mixing plant. Its working principle is as follows:
1. When the bulk cement tank is working, it must be lifted by a special crane, and then placed on the pre-precast concrete foundation, and check the vertical degree of the cement tank and the horizontal plane, and then the bottom of the cement tank and the foundation embedded parts firmly welded.
2. After the storage bin is fixed, the cement is transported to the site by the bulk cement truck, and then the conveying pipe of the bulk cement truck is connected with the feed pipe of the cement bin (cement tank), and the cement in the tank is transported to the cement bin (cement tank) through the gas pressure of the bulk cement truck.
3. In the process of conveying cement to the storage bin, the operator continuously presses the button of the vibration motor of the precipitator to shake off the cement attached to the cloth bag of the precipitator to prevent the clogging of the cloth bag and the explosion of the bin.
4. Once the bag is blocked, the pressure in the silo exceeds the safety pressure of the pressure safety valve on the top of the silo, and the pressure safety valve can be opened to release the pressure in the silo to prevent the occurrence of the explosion accident.
5. Through the high and low material level of the cement tank, the warehouse full and material shortage can be observed.
6. When it is necessary to discharge the material, first open the manual discharge valve at the bottom of the cone, and then transfer the cement out through the cement conveying device (screw conveyor). In the process of feeding, if there is a "arch" phenomenon, press the button of the electromagnetic valve of the arch breaking device in time, blow air, eliminate the "arch" feeding, ensure the smooth supply of cement.
7. When the cement conveying device (screw conveyor) fails, the manual discharge valve at the bottom of the cone of the cement tank should be closed first to prevent cement overflow and waste
Henan Zhongzhenxing Trade Co., offers a complete turnkey solution for all customers, including pre-sales consulting, project design,equipment manufacturing, global installation, spare parts supply, and excellent after-sales service
Q: What are your payment terms?
A: 50% deposit by T/T, balance to be paid before shipment.
Q: What are your main markets?
A: Southeast Asia, Africa, Oceania and Europe
Q: What is your production time?
A: The production time depends on the machine you order. It usually takes 45 days.
Q: What documents can you provide?
A: We can provide invoices, packing lists, contracts, instructions, customs declarations, certificates of origin, CE. If the customer needs other documents and specifications, please confirm with the service staff.
Q: How will you deal with quality problems in the equipment?
A: We will be responsible for all quality problems. We'll check the machine to find out the problem. If you need parts, I'll send them to you.
Q: How long is the warranty?
A:One year.(Damage to vulnerable parts is not guaranteed and requires additional purchase)