Functions: air plasma cutting, manual arc welding
Application industry: low carbon steel, stainless steel, aluminum and other non-ferrous metals
Characteristics
1. The arc energy is concentrated and stable, the cutting force is strong, the cutting surface is smooth and tidy
2. Cutting speed is fast (3-5 times of gas cutting), cutting cost is low
3. High frequency non-contact arc starting mode, high success rate of arcing
4. Plasma/manual arc welding/external air source is available
5. Built-in pump has heat dissipation function
Model | LGK-80NK | LGK-100N | LGK-120N |
Input voltage (V) | AC220V/380V±10% 50Hz | AC380V±15% 50Hz | AC380V±15% 50Hz |
Input power (KVA) | 10.5 | 13.7 | 25.7 |
Input current (A) | 14.2 | 20 | 22.8 |
Rated output voltage (V) | 104 | 120 | 128 |
Output current range (A) | 15-80 | 30-100 | 30-120 |
Output no-load voltage (V) | 280 | 319 | 340 |
Load duty cycle (%) | 60 | 80 | 80 |
Air pressure for cutting torque (MPa) | 0.45-0.55 | 0.45-0.55 | 0.45-0.55 |
Max cutting thickness of carbon steel (mm) | 30 | 40 | 50 |
Cutting air flow (L/min) | 180-230 | 180-230 | 180-230 |
Arc ignition method | high frequency arc ignition | ||
Enclosure protection class | IP21S | IP21S | IP21S |
Insulation class | F | H | H |
Dimensions (mm) | 270*450*380 | 665*365*630 | 690*380*650 |
Weight (kg) | 33 | 46 | 55 |
1. Are you a factory or trading company?
We are the manufacturer of welding equipment, plasma cutting machine and stud welding machine
2. Where is your factory located?
Our company is in Innovation and Entrepreneurship Park, Taizhou City, Jiangsu Province. Welcome to visit our factory!
☆10 minutes to Taizhou bus station by car
☆20 minutes to Yangzhou and Taizhou Airport by car
☆2.5 hours to Shanghai
3. What certificates do you have?
We have gained the certificate of CCC, CE, ISO, ROHS
4. Can you do OEM?
Yes, we accept OEM
5. What's your MOQ?
1 set is available. Different products has different minimum order quantity.
6. What's your delivery time?
The delivery time needs to be decided according to the specific quantity. It usually takes about 30 days after confirming details of the order.
7. What's your warranty?
Our each machine should be 100% tested before delivery and has one year warranty