Description
Product details Applicable range of welding parts
1. Tube length: 1.5-3 meters.
2. Round pipe diameter: Φ48 and Φ60.
3. Number of round pieces: 3-6 pieces.
4. Workpiece length error: < Plus or minus 1 mm
Control input power supply | Three phase four wire380V/50HZ |
Spindle motor | 86BYGH156/Stepper motor 6A |
Load duration | 100% |
Air source pressure adjustment range | 0.2-0.8 mpa |
Maximum adaptive workpiece | 3000mm |
Spindle speed | 0.5-200rpm |
Spindle drive mode | Stepper motor |
Spindle speed control mode | PLC control |
The adjustment mode of sending and withdrawing guns | pneumatic |
Decelerating mechanism | Turboworm reducer |
Body size (length * width * height) | 4500*1850*2250 |
| |
fully automatic ringlock scaffolding standard welding machine.Aauto pipe feeding
It is our invention patent productZL2016 1 0828403.4
The equipment is an automatic welding machine for the production of scaffolding coil buckle vertical rod, which can realize automatic tube loading, automatic spot welding and automatic ring welding. Automatic drop parts and automatic transfer robot palletizing the whole process of cyclic work. Beautiful weld, save cost, improve production efficiency. Company honors and qualifications: Corporate office area:
With high quality products and excellent reputation, Golden Lion sells well all over the world, helps enterprises solve production problems, helps enterprises develop, and establishes long-term cooperative partnership with well-known enterprises at home and abroad. Your success is the eternal pursuit of Golden Lion welder! Let us hand in hand, sustainable development, create brilliant!
Frequently Asked Questions
If I have some problems, what should I do?
-You can contact our salesman directly, our engineer will check the problem. We Provide proofing service before sale and free technical training, online technical guidance, video guidance
How long is the warranty?
-We offer a 1-year warranty(except for the consumable parts like Lens). The supplier will provide detailed information as soon as possible.
If you need help, we have a professional team to help you.
If you have other mold needs technical instruction and video instruction are also provided.
Packaging&Shipping
1. Cleaning machine.
2. Wrap all the machine and parts with bubble film and plastic film.
3. Forklift the packed machine to the container.
4. Choose the optimal routes and transportation modes according to the distance.If you have any questions, please contact us!