High Quality Prefab House Strength Prefab House Labor Accommodation Camp

Min.Order: 100
Product origin: Weifang, Shandong, China
Infringement complaint: complaintComplaint
US$ 20 ~ 40

Description

Prefabricated building / Prefab house is built with light steel frames and kinds of sandwich panels.
Basically there were 2types of prefab house system:
K type prefabricated house and T type prefabricated house. The K type prefabricated house is a modular building system, there were its standard dimensions, the width could be 5560mm, 6230mm or 7360mm, while the length could be N*K (K=1800mm), and the height could be 3P, 6P or 9P (P=950mm, 3P is single floor, 6P is two floors and 9P is three floors), while the T type prefab house will be much more customized, it means the T type house could be designed in any size as requirements.

Product Description

ONE-STOP services & Customized solutions, 10 years+ experience of R&D, Design, Manufacturing, Exportation and After-sales support.

AUTHENTIC MATERIALSREST ASSURED WHEN YOU BUY
Product Features:
All Lj Steel Structure prefab modular buildings can be configured with innovative technologies to increase energy efficiency and comfort.
HVAC and ventilation systems
Lighting and electrical distribution systems
Communication systems
Hard-wall systems and partitions
Windows and doors
Skylights that utilize natural lighting during the day and reduce overall energy usage
Proprietary insulation systems increase energy efficiency while providing a comfortable living or working space
Steel Column2C80*40*15*1.5 painting(K type) / Square tube (T type)
Tri-angle beamPre-welded C80*40*15*1.3/U50*35*1.3 electro-Galv.
First floor main beamC80*40*15*1.5/U50*35*1.2 electro-Galv.
First floor secondary beamC80*40*15*1.3 electro-Galv.
Roof purlinL40*3 electro-Galv.
Ground channel steelC80*40*15*1.3 electro-Galv.
Steel staircaseSquare tube 30*30*2.0/40*40*2.0, 2.5mm checkered plate painting
Steel Corridor1.8mm galv. steel plate/L40*3/tube 40*20*1.0 painting
Roof panel50mm/75mm/100mm Fiberglass/Rockwool/EPS sandwich panel
Wall panel50mm/75mm/100mm Fiberglass/Rockwool/EPS sandwich panel
*Suspended ceiling (*Optional)6mm gypsum board with frame
First floor board18mm plywood board
*Floor leather (*Optional)1.5mm PVC floor leather
*Electrical system (*Optional)Cable/Lights/Switch/Socket/PDB
*Sanitary facilities&plumbing (*Optional)Ceramic toilet/washbasin/shower, input & output pipes
Detailed Photos

SELECTING HIGH-OUALITY RAW MATERIALS
Choose good materials and professional manufacturers Providing raw materials to ensure product quality from the source


NEVER USE INFERIOR MATERIALS

Prefabricated building by Lj Steel Structure offer many benefits and have been used for the following:
Worker Dormitories, Staff Quarters, and Executive Dormitories
Bunkhouses and Sleepers
Fitness Centers
Gymnasiums
Weight Rooms
Game Rooms
Movie Theaters
Commissary
Cafeteria-Style Dining
Food Storage, Preparation, and Serving Areas
Mud Room
Shower and Locker Rooms
Medical Shelters and First-Aid Clinics
Laundry Facilities
Offices, Business Centers, Conference Rooms, and Administration Areas
Security Areas
REUSABLE:

Environmentally friendlv anadurable. with thermal insulation, waterproof and moisture-proof, overall molding.earthquake resistance, winaresistance and water leak-age prevention.
 
BEAUTIFULAPPEARANCE:

Frame fully welded, polished,and professionallysprayed.
QUALITY ASSURANCE:

Adopting rigorous water-proof design and strict con-struction.
FREECOMBINATION:

Multiple container activity rooms, freely assembled.
Production Rendering

Internal Effect Display

Main Feature:

1. Unit figure for K house dimension is K, 1K=1.82m, K is the distance between two closest coulmns.

2. K house can be built as 1 to 3 floors building. Figures for house with different stories: One floor=3P, two floor=6p, three floor=9p

3. K house is qualified water proof, fire proof, heat insulation and sound insulation performance.

4. K house can be relocated to different site, It can be assembled and disassembled six times.

5. K house is anti termites. All steel structures are well painted and anti-rust which can be normally used for 10~15 years, and all materials can be recycled.

6. K house only requires level concrete floor for the foundation. 

7. 4 labors one team, can install more than 200 m2per day.

Packaging and Transportation

 


Company Profile


LJ Steel Structure, a brand of Steel Structure, Container house and Prefab house, is Trusted & Tested. As experts on Steel Structure Building svstem, LJ Steel Structure offerscomprehensive ONE-STOP services, delivering customized solutionsthat encompass Consultation, R&D, Design, Manufacturing, InstallationOverseas project supervision and After-sales support. We specialize in creation of hiqh-quality Steel structure Warehouse.Workshop, High-rise steel frame building and Container house for Labocamp, Worker dormitory, Site office, Shower container, Toilet containeretc. We provide our time-tested steel building to clients in the sectors ofOil & Gas, Mining, Energy, Infrastructure and Construction projects. LJSteel Structure built his reputation upon Profession,Reliabilitvy and Service. Headquartered in Weifang, China, with a factory area of more than66,000 square meters and a registered capital of CNY50 Million, aftelmore than a decade of development, LJ Steel Structure has strongechnical strength and comprehensive product lines, supported by ourdedicated teams with more than 10vears extensive knowledge of PrefabSteel Building, LJ Steel Structure has completed 100+ projects in morethan 30 countries. With the brand-building concept, LJ Steel Structurehas built long lasting partnerships with different international companiesas well as organizations & government.

 

FAQ
Q1: Can we accept the custom service and personalized design?
A: Yes, our professional engineer team can make a drawing by following customers' requirement.

Q2: How to pay?
A: T/T and irrevocable L/C at sight .

Q3: How to install?
A: It is easy and fast assemble. We will provide detailed installation video and instruction to you. Technicians will be sent to help you on site if necessary. However, the visa fee, tickets, accommodation, food and wages will be under taken by buyers.

Q4: What is the delivery time?
A: Normally in 10-15days after deposit received.
Product Tag:
Related categories:
Scroll to Top