Lianggong Manufacture Adjustable Galvanized Steel Ringlock Scaffolding for Facade and Shoring Construction with Good Price

Min.Order: 50
Product origin: Yancheng, Jiangsu, China
Infringement complaint: complaintComplaint
US$ 329 ~ 480

Description

Ring-Lock Scaffolding and Stair Tower 

Ring-Lock scaffolding
Ringlock scaffolding is a modular scaffold system which is more safe and convenient it can be divided into 48mm system and 60 system. Ringlock system is constitute of standard, ledger, diagonal brace, jack base, u head and other componets. Standard is welded by rosette with eight hole that four small holes to connect ledger and another four big holes to connect diagonal brace.

Advantage
1. Advanced technology, reasonable joint design ,stable connection.

2. Assembling easily and quickly , greatly reduce the time and labor cost.
3.Uprade raw materials by low-alloy steel .
4.High zinc coating and long life to use, clean and beautiful.
5.Automatic welding ,high precision and superior quality.
6.Stable structure ,high bearing capacity, safe and durable.



Main components

Project application of ring-lock scaffolding


Ring-Lock Stair Tower
The structure of the ring-lock stair tower is the same as that of the φ60 ring-lock scaffolding, and the cross-section dimension of the stair tower is 1.5×3.0 m. The safety of the stair tower is quick to assemble and disassemble, and the force is reasonable.
Bearing capacity of the stair tower
As the height of the tower erection increases, the force it bears decreases. When it is set to 150m,it can still withstand the force of 0.25KN/m×150m=37.5KN, so it is safe to work when it is 150m high (the tower must be attached to the wall every 4.5m).

Project application of ring-lock stair tower

Packing
1. Generally, the total net weight of loaded container is 22 tons to 25 tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles: Timber beam, steel props, tie rod, etc. 
---Pallet: Small parts will be put in bags and then on pallets. 
---Wooden cases: It is available on customer's request. 
---Bulk: Some irregular goods will be loaded in bulk in container. 
Delivery
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.

our service
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.

Our company

About Us
Yancheng Lianggong Formwork Co., Ltd. is one of the leading formwork and scaffolding companies located in Jianhu Economic Development Zone of Yancheng City, Jiangsu Province. As a well-established company in construction formwork field, Lianggong has been devoted itself and specialized in formwork and scaffolding research, development, manufacturing, and labor service.
During the years of hardworking since 2010 by the whole company staff, Lianggong has successfully delivered and served a large number of projects at home and abroad, such as bridges, tunnels, power stations, and industrial & civil constructions. Major products of Lianggong include H20 timber beam, wall and column formwork, single-sided bracket, crane-lifted climbing formwork, hydraulic auto-climbing system, protection screen and unloading platform, shaft beam platform, table formwork, ring-lock scaffolding and stair tower, cantilever forming traveller and hydraulic tunnel lining trolley, etc.
Utilizing its strong technical background and abundant engineering experience, and always bearing in mind to keep its cost-effectiveness and efficiency for clients, Lianggong will continue to be your best partner in any project from the very start and achieve higher and further goals together.  

 
 
 

Customer Photos

 
 
 
 
FAQ
Q: Are you trading company or manufacturer ?
A: We are factory.

Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.

Q: Do you provide samples ? Is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD,100% in advance.Payment>=1000USD,30% T/T in advance,balance before shippment.
    

If you have another question, please feel free to contact us !
 
Product Tag:
Related categories:
Scroll to Top