Stainless Steel Die-Casting Mold Processing Precision Mechanical Hardware Parts Casting

Min.Order: 100
Product origin: Qingdao, Shandong, China
Infringement complaint: complaintComplaint
US$ 0.5 ~ 5

Description
Detailed Photos

Recommend Products

 
Product Description

Craft

Lost Wax Casting , Precision Casting , Investment casting , Dewaxing Casting , silica Sol Casting , Precision Die Casting , Sand Casting.

Material

Stainless Steel(General SUS304,SUS316,1.4301),etc.,Stainless Iron(General 201,420,430),etc.,High/Middle/Low Garbon Steel(A3,Q235,45),etc.,Alloy Steel(General 20cr,20crme,20crnimo,40crmo,40crnimo,42cr,42crme,42crnimo)etc.,Brass(H59,H62,H75,H80),etc.,Red Copper,Bronze,White Copper and other materials,The above menu is for reference only, if you have special needs,please contact customer service staff.

Process

Wax Injecting War repairing ,Tree Planting , Mucilage , dewaxing , investment , Shell Vibration , Polishing , etc... 48 Processes In TotaL.

Post-processing

Ordinary Polishing , Mirror Polishing , Electrolytic Polishing , Brushed Finishing , Grinding , Heat Treatment , Finishing , Drilling and tapping , Plating,etc.

Ordering Methods

We Can manufacture And Process According To Customer's Samples Or Dravings Designs;Meanwhile We Provide Some Ready Stock for Direct Order.

Mold Lead Tine

Rush Order : 3-5 Davs . General Lead Time:7-10Days ( Peculiar Product Exception)

Sample Lead Time

Urgent Sample : 3-5 days , General Lead Time : 5-7 Days ( Peculiar Product Exception )

Order Lead Time

Urgent Orders:10-15 Days , General Lead Time:15-20 Days ( Peculiar Product Exception )

Terms of Payment

The Mold wili Be made After 100% Payment Of The mold Fee , 50% Deposit Should Be Paid In Advance , The Balance Should Be Paid Before Shipment.

CertiticateTUV

 
 
FAQ

Q1.What material do you have?

SS304/SS316/SS316/Duplex 2205/ Carbon steel/Alloy steel/Aluminum

Q2.Can you provide sample for us?
Yes, free sample is available

Q3. How do you ensure quality control?
we ensure the quality control by 2 steps: 1)after finish, our workers will check it one by one. 2)our package department will check before they pack.

Q4. Can you do the full set project products for us?
Yes we can, our engineer will check your project drawings to make sure its accuracy for each different fittings and quantity.

Q5. How about your delivery time ?
25-30 days for OEM fittings .

Q6.Can you do the any metal products according to our design?
Yes, but the drawing or sample is needed

Q7.What surface treatment for the products your factory can offer?
Mirror, Chrome, Satin, Brushed ,Power coated, Electrolytic polishing

 

Product Tag:
Related categories:
Scroll to Top