When the equipment is running, the sludge enters the filter cartridge from the feeding port and is pushed towards the discharge port by the spiral shaft rotating blades. As the pitch between the spiral shaft rotating blades gradually decreases, the pressure on the sludge also increases and begins to dehydrate under the pressure difference. Water flows out from the filtering gap between the fixed ring and the movable ring. At the same time, the equipment relies on the self-cleaning function between the fixed plate and the movable plate to clean the filtering gap and prevent blockage, The mud cake is fully dehydrated and discharged from the discharge port under the propulsion of the spiral shaft. Based on the different properties of sludge, our company has developed targeted machines that are more practical in structure and have lower operating costs.
Type | DS standard processing capacity (kg/h) | Sludge treatment capacity (m3/h) | ||||||
Low concentration | High concentration | 2000mg/L | 5000mg/L | 10000mg/L | 20000mg/L | 25000mg/L | 50000mg/L | |
m3/h | m3/h | m3/h | m3/h | m3/h | m3/h | |||
HNDL-101 | ~3 | ~5 | ~1.5 | ~0.6 | ~0.5 | ~0.25 | ~0.2 | ~0.1 |
HNDL-131 | ~6 | ~10 | ~3.5 | ~1.4 | ~1.0 | ~0.5 | ~0.4 | ~0.2 |
HNDL-132 | ~12 | ~20 | ~7.0 | ~2.8 | ~2 | ~1.0 | ~0.8 | ~0.4 |
HNDL-201 | ~9 | ~15 | ~4.5 | ~1.8 | ~1.5 | ~0.7 | ~0.6 | ~0.3 |
HNDL-202 | ~20 | ~30 | ~10.0 | ~4.0 | ~3.0 | ~1.5 | ~1.2 | ~0.6 |
HNDL-301 | ~40 | ~60 | ~19.0 | ~7.6 | ~6.0 | ~3.0 | ~2.4 | ~1.2 |
HNDL-302 | ~75 | ~120 | ~37 | ~15 | ~12 | ~6.0 | ~4.8 | ~2.4 |
HNDL-303 | ~115 | ~175 | ~58 | ~23 | ~18 | ~9.0 | ~7.0 | ~3.5 |
HNDL-401 | ~95 | ~150 | ~48 | ~19 | ~15 | ~7.5 | ~6.0 | ~3.0 |
HNDL-402 | ~185 | ~310 | ~92 | ~37 | ~30 | ~15 | ~12.5 | ~6.0 |
HNDL-403 | ~285 | ~450 | ~142 | ~57 | ~45 | ~0.25 | ~18 | ~9.0 |
HNDL-404 | ~365 | ~610 | ~182 | ~73 | ~61 | ~0.5 | ~24 | ~12 |
1.How to buy your interested products?
You can provide us the slurry source, and slurry processing output, flow rate and ground area, material requirements about your project (More details, please contact us).
2.How to pay?
L/C or T/T are acceptable.Usually, 50% payment in advance, 50% payment before delivery.
3.What is the delivery time?
It depends on order quantities. Generally speaking, the delivery time will be within 2months.
4.How to pack the products?
We use standard export package.If you have special package requirements, we will pack as you required, but the fees will be paid by customers.
5.How to install after the equipment arriving destination?
We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you.
6.How long is the validity?
The validity is 12 months after installation.