Infitek Portable 40X 100X 400X 1000X Trinocular Biological Microscope (Siedentopf) with CE FDA

Min.Order: 1
Product origin: Jinan, Shandong, China
Infringement complaint: complaintComplaint
US$ 236 ~ 419

Description

Infitek Portable 40X 100X 400X 1000X Trinocular Biological Microscope (Siedentopf)
Specification

Compensation free binocular head inclined
 
ModelMSC-B208T(Siedentopf)
Viewing HeadSiedentopf Trinocular Viewing Head at 30°IncIined  Interpupillary (55-75mm)
EyepieceWide Field eyepiece WF10X18mm
NosepieceQuadruple Nosepiece
ObjectiveAchromatic Objective 4X,10X,40X,100X
StageDouble Layers Mechanical Stage 140X135mm/ 75X50mm
CondenseAbbe NA1.25 with Iris Diaphragm & Filter
Focusing SystemCoaxial Coarse and Fine Adjustment, Fine Division 0.002mm, Coarse Stroke 37.7mm per Rotation, Fine Stroke 0.2mm per Rotation, Moving Range 28mm
IlluminationS-LED Illumination, Brightness Adjustable
Halogen Lamp 100V-240V/ 6V20W
Plan-concave Mirror
FilterBlue Filter
PackageCarton
Package Size L*W*H (mm)360*260*470
Gross Weight (kg)7

 

Packaging & Shipping

Certifications

 

Company Profile

FAQ

Q: How about quality of the goods?
A:

  1. All the running products comply with CE standards.
  2. Independent quality inspection team, conducting multiple inspections and random inspections from parts supply to product dispatch.
  3. Well-known third-party testing service available, such as SGS, BV, and TUV, etc.
 
Q: What are your pre- and after-sales services?
A:
  1. Timely reply to pre-sales enquiries
  2. Real-time update of manufacturing and shipment status
  3. Contracted third-party maintenance company in over 60 countries

Assured availability of parts supply for 10 years at least

Q: Is OEM service available.
A: Most of the running products are available for OEM customization, including logo, package and function, if attainable, customization.
 
Q: How long is the lead time:
A: Generally, the lead time for most stocked products is about 7~15 days, vary by models and production schedule. For those non-stocked products, the manufacturing lead time is around 20 days.

Product Tag:
Related categories:
Scroll to Top