American 1700mm 1219 Painted Galvanized Steel Ladder Frame Scaffolding Frame Ladder Frame Main Frame Door Frame Manson Frame Scaffolding Frame for Construction

Min.Order: 500
Product origin: Tianjin, China
Infringement complaint: complaintComplaint
US$ 35

Description
 
Product Description
 
Scaffold system is a temporary platform which provide support for scaffolders in height work. There are various scaffold frameworks, such as walk through scaffold frames, mason scaffolding frames, H door frames and so on. 

One set of scaffold framework includes 2 pieces of main frames, 2 pieces of cross braces and 4 pieces of joint pins. The scaffold frames are frequently used in low height outdoor repairing, in house and decoration. Our factory can produce different kinds of surface treatment frames for you. Pre galvanized, Electro galvanized, Painted and Powder coated frames are available.
 
Scaffolding steel Frame 
Material
Q195,  Q235, Q345
Surface treatment
Galvanized, Painted, and Powder Coated
Thickness
1.6-3.0mm
Size
1219x1700mm, 1219x914mm, 1930x1219mm 
MOQ
 One Container
Payment
 T/T or LC
Delivery time
25 days after the confirmation
Packing
In bulk, steel strips in bundle
Product capability
10000 piece/month
Certificate
ISO9001, SGS

 

Detailed Photos




 

Packaging & Shipping



 

FAQ

1. Q: What's your MOQ(minimum order quantity)?
A: One full 20ft container, mixed  products are acceptable. We can produce as per your quantity based on different products. Please feel free to contact us, let's discuss furtherly. 


2. Q: What's your packing methods?
A: Packed in bundle or bulk (customed is accepted). For steel pipes, we pack by steel strips with 61 pieces in bundle. Steel plan, steel frame, and steel prop are packed by steel strips in bundle. Couplers are in pallet. 


3. Q: What's your delivery time?
A: 10-30 days after received the advance payment. For stel pipe, we can arrange shipment within 10-20 days usualy we have steel pipe in production line. For steel plank, steel prop and scaffolding frame, which need further welding, it takes 30 days. We will try our best to arrange shippment asap. Also we can arrange partial shipment based on your quantity.


4. Q: Are you manufacturer or trader?
A: We are a professional steel product manufacturer with more than 15 years of export experience. We have our own factories, one is for steel pipe, one is for galvanization, another is for scaffolding, such as steel plank, steel prop and steel frame. We have over 100  workers, with 5 welding line. Our products are exporting to Southeast and Mideast Asia, EU market. With our own factories, we can control the production cost and delivery time better. And provide you high quality goods with moderate price.

5. Q: Where's your factory?
A: Our factory is in Tianjin city (near Beijing), close to Tianjin Port. Our factory  is located in the biggest steel industrial zone in China, with the steel industrial concentration, we can get raw material and fittings very fast, and arrange shipment ealrier.

6. Q: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case. It is helpful to know better about our factory. We can also do the remote inspection based on current coronavirus situation.

7. Q: Can you supply other scaffolding materials?
A: Yes. All related construction materials, such as scaffold tube, steel plank, scaffolding frame. scaffolding couplers. Besides, we can also source for you.


 

Product Tag:
Related categories:
Scroll to Top