Automatic Metal Strip Butt Joint Welding Machine Flash Butt Welder Facility

Min.Order: 1
Product origin: Dongguan, Guangdong, China
Infringement complaint: complaintComplaint
US$ 2000 ~ 8000

Description


Item
Model
UN-25
UN-35
UN-50
UN-75
UN-100
UN-150
UN-200
Rated capacity
KVA
 
25
 
35
 
50
 
75
 
100
 
150
 
200
Rated Primary voltage
V
 
380
 
380
 
380
 
380
 
380
 
380
 
380
Rated frequency
Hz
 
50/60
 
50/60
 
50/60
 
50/60
 
50/60
 
50/60
 
50/60
Maximum short current
A
 
11000
 
13000
 
15000
 
22000
 
28000
 
32000
 
35000
Maximum clamping rate
N
 
3900
 
3900
 
3900
 
6100
 
6100
 
8000
 
8000
Maximum forging force
N
 
1500
 
1500
 
1500
 
2500
 
2500
 
3000
 
3000
Rated duty cycle
%
 
50
 
50
 
50
 
50
 
50
 
50
 
50

Feature

The power supply unit's duty are balanced. Three phase power make MD frequency inverter more adaptable in winding and pressure
of wire.
More preaser, faster current control, can analyse parameters more and faster compare with power frequency system.
Faster to set up current, the speed is 20folds quicker than traditional technic
Process more reliable: the majority of the application of solder DC welding metal effect will be even better.
Reduce operating costs, including energy savings each and every point of welding as well as shortening the welding cycle.
Save energy :especially suitable for welding thick workpieces and high-conductivity metal .such as aluminum and galvanized
steel sheet.etc.
 
 

Q   Are you a trading company or a factory?
A   We are an integrated industry and trade, and have our own factory.

Q  Where is your factory located?
A  Our factory is located in Songjiang district, Shanghai of China. In addition, we also have factories in Dongguan and Ningbo.

Q  Can you customize the machine?
A  We support OEM/ODM service and can customize the machine according to your requirements.

Q  What is the MOQ?
A  According to the customer's requirements.

Q  What are your services during the purchase process?
A  Pre-sales: Visit the factory, Technical solutions and program design services, Proofing services, Sample testing services.
     On-sales: Technical training, Installation and commissioning services.
     After-sales: Free non-wearable parts, Repair service, Video technical support, Online remote guidance.


Q  How long is your warranty period?
A  We offer a one-year warranty.

Q  What is the payment terms?
A  We ship with full payment, and we can negotiate payment terms.

Q  How long is the delivery time?
A  Delivery time for standard machines: 7-15 working days
     :,1-3

Q  ?
:  ,.
Product Tag:
Related categories:
Scroll to Top