21.8t Excavator Dual Flow Hydraulic Breaker Piping Kit in Stock

Min.Order: 1
Product origin: Jinan, Shandong, China
Infringement complaint: complaintComplaint
US$ 100 ~ 500

Description
21.8t Excavator Dual Flow Hydraulic Piping Kit in Stock

Product show 
 
Product Description

Excavator spare parts pipeline kits for Hydraulic breaker hammer

The following is part of the piping models that we can supply:
 DH35 DH210 DH258 DH300 DH360 ect.
 RB55 RB110 RB170 RB225 R210LC RB290 RB420 RB505 ect
 PC40 PC50 PC60 PC100 PC120 PC200 PC220 PC250 PC300 PC300-6 PC400 PC450 ect.
 EX70 EX100 EX120 EX200 EX200-1 EX300-3 EX240 ZX200 ZX230 ZX360H ect, E60 E70E E120 E200B E320 E320B E320C E320D E330D E324 E330BL ect
 EC55 EC120 EC160 EC240 EC290 EC360 EC460 ect
 SK30 SK60 SK100 SK120 SK200 SK250 SK270 SK320 SK400 SK450 ect
 HD250 HD400 HD700 HD800 HD1200 HD1220 ect
 SH60 SH100 SH200 SH200 SH240 SH280 SH300 SH330 SH340 SH450 ect
 SK60 SK100 SK200 SK200-6 SK220-3 SK100-3 ect
 
Detailed Photos

 


Our Company & Factory

Story of us
The company has been established for its 20th anniversary and has been committed to the production, sales and installation services of excavator supporting pipelines. There are 10 engineering and technical personnel, 5 piping designers, 10 workshop production personnel, and 10 pipeline installation after-sales personnel. There are 5 professional welding technicians; the company's production workshop has all kinds of matching pipeline models, and the inventory types are large, the quantity is large and the quality is high. Our company's pipeline production technology is adept, has its own professional technical advantages, and the follow-up process such as production, sales and installation is one-stop service. Our sales staff are very sincere and professional to provide excavator pipeline supporting services for major manufacturers and customers all over the world.
 


 Installation case
     
   We provide each pipe parts with rigorous package to reduce bump of the product you received.
           1) Standard export package by pallets or wooden cases;
           2) Loading port from Qingdao of China;
           3) Delivery Time : Usually 7-15days after full down payment;


   FAQ
         
  The information you may like to know before order:
    1. Methods of Payment: T/T (Telegraphic Transfer) is best;
    2. Handling time for an order Based on order quantity, normally it takes 25 days for production; Only 2 or 3 days if we have stock       on your request size.
    3. Shipping way Sample order: we suggest Courier express like DHL/UPS/TNT/FEDEX or by air; Bulk order: we suggest by air          or  by sea.
    4. Quality Control We have our own experienced QC; There will be strict inspection and testing for every order before shipping           out.
    5. After Services:
       1)Our sales team will response for your question within 24 hours (Holidays Excluded);
       2)Technical Support will be available in any time;
       3) Free replacement will provide once the failure confirmed caused by our product quality;

    Should you have any questions,call me,let's talk details.
 
Certifications

Other Products



Product Tag:
Related categories:
Scroll to Top