Drinks/Oil/Beverage/Milk Blow Bottle Liquid Filling Sealing Machine Filling Machine Juice Production Line with Washer,Conveyor,Packing,Labeling,Sterilization

Min.Order: 1
Product origin: Weifang, Shandong, China
Infringement complaint: complaintComplaint
US$ 120000 ~ 180000

Description
 


MOST IMPORTANT THING:WE CAN PRODUCE THE MACHINE AND THE BOX TOGETHER!!!!!!!!!!!!!!!!
MOST IMPORTANT THING:WE CAN PRODUCE THE MACHINE AND THE BOX TOGETHER!!!!!!!!!!!!!!!!
MOST IMPORTANT THING:WE CAN PRODUCE THE MACHINE AND THE BOX TOGETHER!!!!!!!!!!!!!!!!


We are the leading manufacture of producing the boxes for 20 years,we use the world-class satellite flexographic printing press,multi-cascade combined extrusion line and more than a dozen sets of flexographic printing production lines,with a complete quality assurance system and 24,000 square meters of 100,000 class purification workshop,strong technical force. From the year of 2015,we begin to produce the filling and sealling machine.
 


HL-S3000 type gable top carton filling machine is full automatic with top level configuration. It is provided with different types to meet different customers' need, according to the output, configuration, automatic degree, carton size, etc.


Description

1 Capacity                2500-3000 Boxes/Hour (1000ml, 500ml, 250ml)
                                 (Capacity according to the viscosity of filling material)
 
2 Carton Box             Standard gable top boxes (70mm*70mm), A type box
                                   Volume of box: 1000ml, 500ml, 250ml
 
   Available Filling Material  Milk, Yogurt, Lactic acid beverage, Butter; egg tart; coffee drinks, other liquid drinks.
 
  Cap                   Cap installing part can be customized by customer, and location is reserved on the machine.

3 Adjustment range of filling quantity      1000ml:920ml-1000ml,
   500ml:450ml-500ml,
   250ml:200ml-250ml

4 Electricity Power           50Hz,23.9kW(3Φ×380V Voltage range±5%)
   Main Motor                  2.20  kW
   Sealed Heater            18.5kW
   Bottom Heater
                (11.00 kW×1)
   Top Heater                  (7.50 kW×1)

   Fan for Sealed Heater    (0.75kW×1)
   Fan for Bottom Heater     (0.75kW×1)
   Fan for Top Heater            (0.40kW×1)

   Blower for Air Cleaning Device    0.2kW
   Date Printing Heater              0.50kW
   Control System (approximately)    1.55kW       
   Totally                                          24.1kW 

5 Compressed air consumption    VN=2200L/Min(0.7MPa(7kgf/cm2)) 
Connection caliber R3/4
                                 Maximum oil mist concentration  30mg/Nm3
Filtration grade                0.30μm
Dew point                     -20ºC
Do not use compressed air containing organic solvents

6 Consumption of cooling water
Ice water 4.0L/min, 2ºC--5ºC, 0.25MPa (2.5kgf/cm2) , Connection caliber R1/2
Bottom Sealing Template, Top Sealing Jaw for Cooling
Tap water 3.5L/min, 8ºC--12ºC,0.4MPa(4kgf/cm2), Connection caliber R1/2
Cooling of mandrel and carton conveyor belt

7 Main dimensions
Shape size 1500W * 3100L * 2510H (width * length * height)

8 Weight        2600kg (approximately)

9 Accessory equipment  Cap supply reserved installation location (customer can choose cap device)

10 Working conditions 
(1) ISO Class8 (JIS B9920)
Please install it in the working conditions of grade 100000 (U.S. Fed. Std. 209E).
(2) The carton device and discharge part of filling machine should not be directly arranged at the tuyere of air-conditioning equipment.
(3) When the safety door is opened, please do not let the air outlet of air conditioning and other equipment blow into the filling machine. And, when the safety door is opened, the air blown out by the air conditioner and other equipment should not be inhaled in the filling machine.
(4) At the suction port of HEPA filter, do not let water vapor and dust enter. (Customer Matching)
(6) It is suggested that the filling machine should be installed in the working environment above 18 and below 25 and below 75% RH.
(7) The working environment will deteriorate under the condition of insufficient ventilation in filling room.

(8) After the end of production, please clean and sterilize the bed, safety cover and drainage pipe. Also, in order to prevent rust caused by dew, please keep the room dry.

11 Points for Attention of Electric Box
Due to the installation of precise electrical components in the electrical control box, the outlet of hot water or steam should be avoided in the vicinity of the electrical box.
And dew on the ceiling, cleaning liquid etc., please do not drop it on electrical appliances.

12 Issues after installation of filling machines

After the filling machine is installed, if your company needs to improve and repair the accessory equipment, the installation conditions of the filling machine will change due to the modification, please contact our company.

 


Why Choose Us                                                                                   


At the same  good quality, we also give customer good prices.
We can ensure in China, at the same quality our price is the best.
we have much confidence to offer excellent products and competitive price to our customers. We will be very glad to have your inquiry, feel free to as any questions you may have. We will try our best to help you in any way we can !
Any production details please feel free to contact me,looking forward to hearing from you!


Product Tag:
Related categories:
Scroll to Top