High Load Bearing Faster Installation Elevator Formwork System

Min.Order: 1
Product origin: Suzhou, Jiangsu, China
Infringement complaint: complaintComplaint
US$ 2.5 ~ 5

Description
High Load Bearing Faster Installation Elevator Formwork System
Product NameConcrete Plastic Formwork Crawl Space Formwork
MaterialPP
ColorCustomized Color
Product Advantages
  1. STACKABLE: Unmatched logistical advantages when transporting and storing. At a height of 50 cm, conventional filling requires 50 trucks of filling in comparison to only 1 truck of NEW ELEVETOR.
  2. LIGHTNESS: By far it is the lightest filling solution; the total weight of the cross-section is approximately equal to the thickness of the upper slab.
  3. HIGH LOAD BEARING: Countless pillars, arches, and domes create the highest load-bearing structure.
  4. VOID n SPACE: The void space created under NEW ELEVETOR allows an easy installation of electrical as well as mechanical systems. The void space is also perfect to ventilate damp and RADON GAS away from the building.
  5. FAST: When compared to traditional systems, it guarantees faster installation times up to 80% (with respect to the use of traditional inert materials).
  6. SAVINGS: The NEW ELEVETOR system allows savings compared to the use of traditional inert materials, especially in terms of transport and installation.   
ApplicationBuilding Construction

Typical technical data of TPDVF system:

Advantages of Revak System

The air cavity formed by the Revak System modules must be connected to the outside with simple pipes. This creates a natural airflow that crosses the cavity and eliminates moisture and Radon gas (if present).

1. Reduction of manpower requirements by up to 80% in comparison to traditional systems.

2. Drastic reduction in the use of concrete and aggregates as the arch form permits maximum resistance with a minimum thickness.

3. Possibility to implement, in a single solution, foundation beams and the slab with the help of the L-Plast accessorie.

4. Adaptable to non-standard spaces as the modules can be cut without underpinning.

5. Ease of positioning due to lightness and simple linking of the modules.

6. Simple adaptation to various perimeters.

7. Quick and immediate cutting and shaping of the modules.

8. Passage of the underground systems in every direction.

9. Creation of a barrier against humidity.

10. Tightness against rising humidity.

11. Effective ventilation in all directions.

12. Disposal of any RADON gas.

13.No points of contact between the concrete and the ground.

14. Perfect transpiration of the perimeter wall.




Are you a trading company or manufacturer?

We are manufacturer.

 

About Sample?

Few samples can be offered per your request.

 

About Material Color?

We can make the material to your appointed color according to Pantone/RAL#.


How does your factory control the quality?
Quality is the Priority, We always pay great importance to quality from beginning to end, and we have professional QC for item quality from spare parts to finished goods.

 

 How many days for mass production?

20 days after all artwork and 30% deposit are confirmed.
 

 How can I get the samples? is the sample free? 

7-10 days to send free samples by DHL, TNT, and UPS.

Product Tag:
Related categories:
Scroll to Top