Infitek Bep-M920 Digital Precision Benchtop pH ORP Meter

Min.Order: 1
Product origin: Jinan, Shandong, China
Infringement complaint: complaintComplaint
US$ 15 ~ 280

Description

Infitek BEP-M920 Digital Precision Benchtop pH ORP Meter
Features

Measurement Parameters

• BEP-M920: pH, mV, relative mV, temperature

BEP-M920   Features

pH

• 1 to 5 points calibration with automatic recognition for USA, NIST and DIN buffers

• Automatic electrode diagnosis shows the pH slope and offset

• Automatic temperature compensation ensures accurate readings over the entire range

• Calibration due alarm prompts user to calibrate the meter regularly

ORP

• 1 point offset calibration allows adjusting the displayed value to a known standard

• Relative and absolute millivolt modes ensure the reliable ORP measurements

General Features

• Auto-Read function senses and locks the measurement endpoint

• Setup menu allows setting the pH buffer set, number of calibration points, resolution, stability criteria, temperature unit, date and time, etc.

• Reset function automatically resumes all settings back to the factory defaults

• Expanded memory stores or recalls up to 500 data sets

Specification

Model

BEP-M920

pH

 

 

 

 

Range-2.000~20.000pH
Resolution0.001, 0.01, 0.1pH, selectable
Accuracy±0.002pH
Calibration Points1 to 5 points
pH Buffer OptionsUSA, NIST, DIN, 2 custom buffers

ORP

 

 

 

 

mV Range±1999mV
Relative mV Range±1999mV
Resolution0.1, 1mV, selectable
Accuracy±0.2mV
Calibration Points1 point

Temperature

 

 

 

Range0~105°C/32~221°F
Resolution0.1°C/0.1°F
Accuracy±0.5°C/±0.9°F
Offset Calibration1 point, reading ±10°C

Other Specifications

 

 

 

 

 

 

 

 

 

 

 

Temperature Compensation0-~100°C,manual or automatic
Stability CriteriaLow or high
Calibration Due Alarm1 to 31 days or off
Slope/Offset DisplayYes
Hold FunctionManual or auto-endpoint
Memory500 data sets
Communication InterfaceUSB
ConnectorBNC, 3.5mm jack socket
DisplayCustom LCD(125×100mm)
Power RequirementsDC5V power adapter
Dimensions210(L)×188(W)×60(H) mm
Weight1.5kg

Ordering Information

BEP-M210/920-CN: Meter, E201-BNC plastic body pH electrode, temperature probe, pH buffer sachets, electrode holder, USB cable (for BEP-M920 only) and power adapter

BEP-M210/920-UK: Meter, P11 glass pH electrode, temperature probe, pH buffer sachets, electrode holder, USB cable (for BEP-M920 only) and power adapter

BEP-M920-ORP: Meter, E201-BNC plastic body pH electrode, 501 ORP electrode, temperature probe, pH buffer sachets, electrode holder, USB cable and power adapter


Ordering Information

BEP-M210/920-CN: Meter, E201-BNC plastic body pH electrode, temperature probe, pH buffer sachets, electrode holder, USB cable (for BEP-M920 only) and power adapter

BEP-M210/920-UK: Meter, P11 glass pH electrode, temperature probe, pH buffer sachets, electrode holder, USB cable (for BEP-M920 only) and power adapter

BEP-M920-ORP: Meter, E201-BNC plastic body pH electrode, 501 ORP electrode, temperature probe, pH buffer sachets, electrode holder, USB cable and power adapter

Packaging & Shipping

Certifications

Company Profile

FAQ

Q: How about quality of the goods?
A:

  1. All the running products comply with CE standards.
  2. Independent quality inspection team, conducting multiple inspections and random inspections from parts supply to product dispatch.
  3. Well-known third-party testing service available, such as SGS, BV, and TUV, etc.
 
Q: What are your pre- and after-sales services?
A:
  1. Timely reply to pre-sales enquiries
  2. Real-time update of manufacturing and shipment status
  3. Contracted third-party maintenance company in over 60 countries

Assured availability of parts supply for 10 years at least

Q: Is OEM service available.
A: Most of the running products are available for OEM customization, including logo, package and function, if attainable, customization.
 
Q: How long is the lead time:
A: Generally, the lead time for most stocked products is about 7~15 days, vary by models and production schedule. For those non-stocked products, the manufacturing lead time is around 20 days.

Scroll to Top