Aspects | Details |
Material | 6063-T5 |
Temper | T3-T8 |
Surface treat | Mill Finish/Powder coating/Anodized/Wooden Grain/Polish/Brush |
Color | Custom Color |
Length | Customers' Request |
Technology Standards | GB/5237-2008 |
Processing | General Machining/CNC Machining |
Haofeng Aluminium Industry Co.,Ltd win obtain ISO9001 certificate, surface and systems patents and some China top quality and good cooperate supplier honor.
For different requirements of products, we develop many surface treatment and colors.Including Mill finish, Powder coating, PVDF coating, Crystal swim coating, Anodized, Electrophoresis, Machine and Chemical polish, Sandblasting and Brush, Normal wooden grain and 3D wooden grain transfer.
General Package: Protect film on decoration face, pearl cotton and plastic film as outer package.
Special Package: Wooden case/box, PE or PP bag for each piece, Steel panel and so on.1. Q: How about the products standrads?
A: Technology Standrads: GB/5237-2008.
2. Q: How to make customized?
A: Customers offer CAD drawing or products samples, we will make form and
drawings, send back to customers to confirm, then customers pay to make
new moulds.After testing moulds, we will send test samples to customer
to confrim before quantity production.For the regular size new moulds,
when you make order up to 5 tons,we will refund moulds cost, the moulds
are in our own.
3. Q: How to make OEM?
A: We will sign agreement and customer need to offer us brand authorization,
we will product customized products with mark customers' brand on the
package with requirements.
4. Q: How to deal after-sale?
A: Within 15 days after customers receive goods without questions, goods
are seem as pass. If customers find some quality problems, please show
clear pictures and let us know the quantity.We will check to confirm the
reasons and discuss reparation form with customers if it isour problems.
5. Q: How about the payment terms?
A: 100% T/T for new moulds. FOB China port, T/T 30% deposit, 70% balance
is paid before loading.
6. Q: How about the delivery time?
A: With regular production, 20-25 days after receiving deposit.
7. Q: How about the products area?
A: We can offer general machine processing and CNC machine processing
to produce aluminium products.We have cooperation factories to produce
aluminium door and window.