Factory Sale Air Conditioner for Urban Subway Type a

Min.Order: 5
Product origin: Guangzhou, Guangdong, China
Infringement complaint: complaintComplaint
US$ -1

Description
Guangzhou Jingyi auto air conditioner introduction

 




 
Jingyi Group's Vehicle Air Conditioner manufacturing equiment capacity: 6 production lines for bus and
midibus air-conditioner unite (Annual production capacity of 50000 sets).
9 production lines for all kinds of product quanlity test, with more than 130sets equipments.
Entrtprise hardware facilities manufacturing equipment level in industry-leading position,
is domestic bus air-conditioning R&D and manufacturing base.






production line
 






Product detail









 





 



Technical data
model applicableUrban subway type A
unit type roof mount (both end cool air outlet and return air inlet)
throttle typecapillary
cooling capacity42kw
standard condition intel air dry bulb temp.29ºC, relative humidity 60%, outdoor dry bulb temp. 35ºC
evaporator air flow5000m3/h
condenser air flow18000m3/h
refrigerant R407C
refrigerant charge2.5*4 kg
circuit power3 phase, 4 wiring, AC380v+-10%,50Hz +-5%
control circuit powerDC110V
power input about 18kw
dimension3760*1600*475mm
weightabout930kg
frame materialSUS304


Question& Answer

Q. 1: Are you manufactory or trade Company? 
We are the Manufactory specialized in air conditioning industry products for 31 years already. We have 4 bus air conditioning factories in Guangzhou, Guangdong province, China. Our factory have passed IS09001:2000, CCAP and ISO/TS 16949: 2000.
Also we had latest Technical Center and quality control testing department for purchasing products for clients.

Q. 2:  How to control quality? 
A, all the raw materials by IQC (Incoming Quality Control) before launch whole process into the process after the screening.
B, process each link in the process of IPQC (Input process quality control) patrol inspection.
C, after finished by QC full inspection before packing into the next process packaging.
D, OQC before shipment for each product to do full inspection.

Q. 3: How long can I expect to get the products? 
The delivery time is within 15-20 days once receipt of the deposit.
 
Q. 4: How to order? 
 
We need to know the following information for your order before sending you PI.
1) Product information-Quantity, Specification (Your size of buses, model of current use of buses (if have), city bus or coach, compressor bracket assembly and alternator needs)
2) Delivery time required.
3) Shipping information-Company name, Street address, Phone & Fax number, Destination sea port.
4) Forwarder's contact details if there's any in China.







Product Tag:
Related categories:
Scroll to Top