Race Timing Self Adhesive Sticker with White Paper Layer

Min.Order: 1,000
Product origin: Jinan, Shandong, China
Infringement complaint: complaintComplaint
US$ 0.12 ~ 0.15

Description
Product Description
 

Product Description                                                                    

ISO 18000-6C 9662 Alien H3 Wet Dry Inlay UHF Tag RFID Adhesive label Tag Sticker

Operating Frequency

860- 960MHz 

Protocol/standard Options

ISO18000-6C

Dimensions

73*21mm, Customized size is welcome

Chip options

Impinj ,Alien

Substract Material Transponder

PET + AL antenna

Antenna

Aluminum Etching 

Read range

1 to 10m,

depends on reader /tag antenna size, usingenvironment

Working temperature

-25ºC~ +55ºC

Store temperature

-25ºC ~ +65ºC

Data Storage Duration

over 10years

Printing Options

silkscreen/CMYK  Offset Printing

Additional crafts

Bar-code, QR Code,programmable,  Laser Engrave Printing,encryption ,etc

Application

Stock management, Access control; Parking meters; e-Payment Turnstiles;Vender;Loyalty system for promotion; 

Technique

FLIP CHIP ALUMINIUM ETCHING

Multi-Detection

Yes

Related products

RFID Label/stickers , rfid tagz with epoxy etc

 

Detailed Photos


Packaging & Shipping

Company Profile


IDtrack tech has many years experience in producing RFID card and tags. We sell to many countries in the world. We have the most advanced production equiptment and the most professional workers. Quality is the most important title in our facory. We always supply customer the most stable quality with the best price.

Certifications
Related products
 

 

FAQ

Question 1: How to place an order?
A: The procedure is like this:
1). Contact customer service to determine the specification and product model, quantity and other detailed information (you can also arrange freight forwarding by yourself);
2). We provide you with a proforma invoice according to your final decision, which contains all product details;
3). You need to arrange 30% of the payment to our bank account, and then we will prepare the product to start production (the cycle is generally about 10 days, which can be shipped specifically for your order configuration quantity);
4). After the product is completed, the remaining payment is paid, and we arrange forwarder delivery (or we provide relevant information to arrange forwarder transportation by ourselves).
5). After completing this process, the customer service will track the product location and notify you when it is about to arrive and when it arrives, so that you can quickly prepare for customs clearance and other related issues.
6). After getting the items, there will be a dedicated after-sales team waiting for your follow-up feedback.

Q2. What is your production/delivery time?
A: The production/delivery time will be controlled within 20 days (generally, it can be shipped in 10 days and simple configuration is 2-3 days).

Q3. Do you test all items before shipping?
A: Yes, we have passed 100% testing before shipment (basic equipment testing also includes roads, climbing, raining, over-water roads, etc.).
 
Q4. Do you support sample shipment?
A: Yes, we support shipping samples to the port


Why choose us?
1. Complete certificate
2. Perform 100% QC inspection before leaving the factory
3.100% tracking the progress of product orders and feedback
4. Real-time tracking of customers to ensure that orders are produced in strict accordance with customer plans
5. Complete development and supply chain to provide follow-up quality assurance.

Product Tag:
Related categories:
Scroll to Top