Prefab Steel Building Manufacturers Precase Building Wall Construction Workshop Precast Industrial Buildings Prefabricated Steel Sheds

Min.Order: 500
Product origin: Qingdao, Shandong, China
Infringement complaint: complaintComplaint
US$ 55 ~ 75

Description

 

Product Description

 

ADVANTAGES FOR STEEL STRUCTURE BUILDING
1.Flexible layout
2.Good ductility, strong plasticity and deformability, high seismic resistant and wind resistant
3.Quick build and long service time
4.Light weight,high quality and low cost
5.Environmental, Material can be 100% recycled or degraded
 

Project Parameters

Items
Specifications
   Project Name  Prefabricated storage steel warehouse prefab barn for sale
Column & Beam
Welded or Hot rolled H-section
Connection methed of
Welding connection or bolt connection
Wall & Roof
EPS, Mineral wool, PU sandwich, Galss wool+ singles sheet,  corrugated steel sheet
Door
Rolled up door or Sliding door
Window
Plastic steel or Aluminum alloy window
Surface
Hot dip galvanized or painted
Crane
5MT, 10MT, 15MT and more
 

Project Exhibition

 


 

Packaging& Trasportation

PACKAGING& LOADING
1. All standard components are packed in plywood box.
2. All steel structure weld components are packed with blanket or bubble-wrap to avoid scratch during loading and unloading.
3. All steel structure are packed in steel pallet together into container, much save loading and unloading time, labor cost.
4. All sandwich panel are packed in steel pallet.
5. Material components will be made container load plan, also make regional unloading plan to avoid retransport on site.

Port




TRANSPORTATION
We have more than 10 logistics companies that have cooperated with us for many years and can apply for the most favorable transporation charage for you.

Company Profile

About Xinguangzheng
Established in 1997,Qingdao Xinguangzheng Steel Structure Co., Ltd is a large-scale professional manufacturer specializing in designing, modeling, manufacturing and installing Steel Structure Projects.

Advanced equipment, great production capacity and prompt delivery  that make us establish good relationship with more than 90 countries and regions:Canada,The United States,UAE,South Africa,Germany,France,Japan,Argentina,Venezuela and many other countries and regions. And we have participated in many significant construction projects,  such as Argentine Workshop, Australian Aircraft Hanger, Mauritius Government Projects and so on.

The company tenet of us is to "perfect itself and create wealth by taking the social development as its responsibility;the enterprise,a platform;and its team, the core of development".


SALES AND SERVICE NETWORK
XGZ have the Chinese Managing Qualification of external contractor for Construction by Chinese Ministry of Commerce, andhas cooperated with B&R countries long before. We face European and American markets and seek for international devel-opment path; our partners are from Canada, Australia, Germany, France, Brazil, England, America, etc., more than 80 coun-tries all over the world.

The group embraces the corporate mission of " social responsibility, enterprise oriented, team focused, create wealth and self improvement'



OUR ADVANTAGES & SERVICES
Pre-sale service
1.Consultant service
2.Primary design plan
3.Budget calculation

4.Draw up the contract

During-sale Service
1.Fabrication and Packing
2.Statistcal table of material
3.Delivery 
4.Submission of specific construction drawings


After-sale Service
1.Guidance and instructions for installation
2.Installation on site in needed
3.Feedback after sale


CERTIFICATE



CLINETS VISIT

FAQ

1.What's the common type of the industrial building?
Portal frame is the usual type in the industrial workshop and warehouse shed. Other types also could be designed and manufacturer as per clients' request.

2.What are the payment terms?
TT and L/C are acceptable and TT will be more appreciated. 30%deposit before producing, 70% balance before loading by TT.

3.What is the delivery time?
It depends on order quantities and how complicated it is Generally speaking, the delivery time will be within 30 to 50days after deposit.

4.How to pack the products?
We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.

5.How to install after the goods arriving destination?
We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.

Product Tag:
Related categories:
Scroll to Top