Factory Directly Promotion Top Technology Carbon Steel Roller Ball Machine

Min.Order: 1
Product origin: Huzhou, Zhejiang, China
Infringement complaint: complaintComplaint
US$ 0.5 ~ 1

Description

Carbon Steel Galvanized Units Ball

Product Description

1. Could realize the convey of every direction.

2. Simple struture, running smoothly.

3. According to different environment, optional for stainless steel or other material.

4. The bottom of goods must be flat and rigid.

5. Lube oil is needer in operation.

 

Product Parameters

 

WA-01-A

 

Coded(mm)d1(mm)D(mm)D1(mm)h(mm)H(mm)L(mm)L1(mm)S(mm)Static load(kg)Dynamic load(kg)Weight(g)
WA-01-A5.525.440502430.755.568.51.22530142

Material:carbon steel galvanized

Ball:carbon steel ball,plastic steel ball

 

WA-01-B/C

 

Coded(mm)d1(mm)D(mm)D1(mm)h(mm)H(mm)L(mm)L1(mm)S(mm)Static load(kg)Dynamic load(kg)Weight(g)
WA-01-B5.525.442502430.755.568.51.22530136
WA-01-C4.215.87527.832.81520.540501.6152038

Material:carbon steel or stainless steel

 

WA-02

 

Coded(mm)D(mm)d1(mm)H(mm)L(mm)L1(mm)Static load(kg)Dynamic load(kg)Weight(g)
WA-02765.525.446.4627790110480

Material:carbon steel galvanized

 

WB-01

 

Coded(mm)D(mm)D1(mm)D2(mm)D3(mm)L1(mm)L2(mm)L3(mm)Static load(kg)Dynamic load(kg)Weight(g)
WA-01-A5.525.470.555.54017.3312.54555147

Material:carbon steel galvanized

Ball:carbon steel ball,plastic steel ball

 

WB-02

 

Coded(mm)d1(mm)D(mm)D1(mm)D2(mm)h(mm)H(mm)L(mm)L1(mm)S(mm)Static load(kg)Dynamic load(kg)Weight(g)
WB-025.525.44244.55513.83256701.22530158

Material:carbon steel galvanized

Ball:carbon steel ball,plastic steel ball

 

WC-01

 

Coded(mm)D(mm)d1(mm)h(mm)H(mm)S(mm)Static load(kg)Dynamic load(kg)Weight(g)
WC-0125.4434925.53515.54555165

Material:carbon steel galvanized

 

WC-02

 

Coded(mm)D(mm)d1(mm)h(mm)H(mm)S(mm)Static load(kg)Dynamic load(kg)Weight(g)
WC-0222.2235.54592834050126

Material:carbon steel galvanized

 

 

WC-03

 

Coded(mm)D(mm)d1(mm)h(mm)H(mm)S(mm)Static load(kg)Dynamic load(kg)Weight(g)
WC-0315.87524.532152112151744

Material:carbon steel galvanized

 

WD-01/02

 

CodeD(mm)D1(mm)D2(mm)d(mm)L1(mm)L2(mm)L3(mm)Static load(kg)Dynamic load(kg)Weight(g)
WD-0119.051623.5M6142721304050
WD-0225.42531M81736284050127

Material:carbon steel galvanized

 

 

WD-03

 

Coded(mm)d1(mm)D(mm)D1(mm)D2(mm)h(mm)h1(mm)HSStatic load(kg)Dynamic load(kg)Weight(g)
WD-03M1025.4364045.51427.73634050171

Material:carbon steel galvanized

 

 

Factory & Equipment

Huzhou CCDM Logistics Co., Ltd was established in 2000 for the purpose of technically serving the conveyor & many kinds of mesh in steel or st. st and conveyor components industries. With the experience of almost 20 years, we are the leading manufacturer and exporter of various kinds of conveyor & components in China.

All of our conveyor & conveyor components have good specifications and are widely used in machine factories of conveyor system and so on. And are widely exported to many countries and regions, including Europe, America, Southeasten Asia and Australia.

We are always offering customers' excellent quality, competitive price, prompt delivery and after-sale service. And also welcomes production according to customers' samples or drawings.

 

Other Products

 

 

 

 
FAQ

1) Can we get your free samples?

Yes, it is ok. Our Samples are free for the customers. But the freight for express is on buyer's account.

2)How long to get the sample?
After you pay the freight charge and send us confirmed files, the samples will be ready for delivery in 3-7 days. The samples will be sent to you via express and arrive in 3~5 days.

3) Can we combine many items size in one container in my first order?
Yes, it is ok. But the quantity of each ordered item should reach the MOQ for trail order.

4) What is the normal lead time ?
A. For inventory products, we will send goods to you within 7-10 work days after we receive the deposit.
B. For mass production, the delivery time is 25-28 days after we received the deposit
C.For OEM products, the delivery time is 30-35 work days after we receive the deposit.

5) What is your payment term?
T/T 30% advanced before production,70% balance payment before delivery

6) What is your shipping way?
We will help you to choose the best shipping way according to your detail requirements.
By sea, by air, or by express delivery, etc.

7)How long to get the sample?
After you pay the freight charge and send us confirmed files, the samples will be ready for delivery in 3-7 days. The samples will be sent to you via express and arrive in 3~5 days.

8)How is your package?
Normally packed with wooden drums and cartons, other ways can be done according you.


Welcome to cooperate with us . We would like to provide our distributor/agent promotion price as reward for the cooperation. If you are interested, please do not hesitate to contact us!

 

Product Tag:
Related categories:
Scroll to Top