(1) 5Tons un-coiler | |
Description | There are different choices, please turn to the catalogue of un-coiler |
(2) The general machine parameter | |
Suitable roll forming material | Galvanized steel sheet or Ex cold rolled sheet |
Thickness | 1.8-2.0mm |
Frame design | Wall-plate-frame-design /Strong-stand-frame-design |
Roll stages | 10 stages |
Pre-Leveling Device | The In-feed Section of the machine allows for variations in sheet width Pre-Level Device with 4 over 3 shafts to remove the Coil-set |
Material of forming roller | 45# steel, CNC lathes, Hard Chrome Coated |
Shafts Diameter | Φ75mm |
Main motor power | 11KW, Frequency speed control |
Max. Line speed of roll former | 15 m/min (Higher speed is available, depends on the specification required by the buyer) |
Hydraulic group power | 15KW |
Material of cutting blade | Cr12 Mov, heat treatment |
Pump motor | 5.5kw |
Electric Standard | 380V /50Hz/3PH or as per customers' requirements |
Machine Dimensions | 11760mm×1980mm×1630mm (estimated only) |
Major Color of Machine Painted | RAL 5015 (Blue) or as per customers' requirements |
(3) PLC Control system | |
PLC | Siemens brand (ABB brand is available if required) |
Touch Screen | Siemens brand (ABB brand is available if required) |
Inverter | Schneider brand (ABB brand is available if required) |
Encoder | Omron brand |
(4) Product rack | |
Description | Un-powered, 6 meters length |
(5) Option:
| |
(6) Service after sell | |
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements. Installation: (1) If installation is needed, Liming (the seller) will dispatch technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist Liming to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation. (2) If installation is needed, the buyer shall make the following preparation before arrival of technicians. a) Position the machine in the buyer's factory. b) Prepare necessary electric wiring. c) Prepare material of trial running. d) Provide labors for assistance and installation during installation. e) If possible, One Chinese-speaking interpreter so that the communication between the buyer and seller's technician will go smoothly. |