Hot Product :
Specification | Customized as drawing or sample |
Part Weight | 0.5KG-20KG |
Casting Standard | JIS,ASTM,DIN,GB |
Casting Tolerance | CT 7~8(IS0 8015) |
Surface Roughness | Ra 50 |
Casting Material | FCD400,FCD450, FCD500,QT550-10, QT600-3,FC200,FC250,FC300, HT200,HT250,HT300,GGV30 |
Casting Process | Gravity Casting, Sand Casting |
Pressure Chamber Structure | DISA D3 Vertical |
Surface Preparation | Shot-blasting, Painting,Electroplating, Electrophoresis |
Inspection Equipment | Metallographic Inspection, Spectrum Detection, MTS Tensile test, Brinell hardness Test, XRay Detection, Magnetic Particle Detect, Audio Frequency Inspection, CMM, Gauge, 3D Scanning, Nodlarity Inspection |
Dimension Inspection | Coordinate Measuring Machine (CMM),Calipers, Height Gauge, Micrometer Calipers, Inside Caliper Gauge, Angle and R Gauge,Customized Gauge, etc. |
Product application | 90%+ Auto parts for passenger cars and commercial vehicles,10% for truck, train, railway, agricultural machinery, engineering machinery. |
Lead Time | 45 Days for Iron Casting |
Quality Control:
Our Certifications
Packaging & Shipping
Q1: Are you a manufacturer or a trading company?
A1: Luoyang Gucheng is one of the largest professional manufacturers of Chassis System (brake caliper, brake support, steering knuckle), Engine System(engine block, engine cover, intake manifold and so on), Transmission System(forkshift, control arm), and subway track shock absorber castings and other products.
Q2: What certifications do you have?
A2: IATF16949, ISO14001, ISO45001, etc.
Q3: How about your lead time?
A3: For casting(Iron)+machining sample during OTS phases, it usually takes about 35 days to prepare at our facility after joint confirmation of tooling 3D;
For casting(aluminum)+machining sample during OTS phases, it usually takes about 60 days to prepare at our facility after joint confirmation of tooling 3D.
For mass production order, it usually takes about 4-6 weeks to prepare at our facility. Of course, it depends on quantity of order, we believe that we can give a satisfied delivery performance.
Q4: Which customers do you supply parts to?
A4:
Our Tier 1 customers include:
1) Japanese and South Korea Company: Akebono Brake Industry, Hitachi Astemo, Mobis, Mando Advics etc.
2) European Company: ZF, Brembo, Schaeffler, Mahle, Hidria etc.
3) American Company: Chassix, Concentric;
4) Chinese Local: Bethel Automotive Safety Systems Co., Ltd, BWI, Jilin Universal Machinery(GROUP) Co., Ltd., Wanxiang Group, APG etc.
2. Our OEM customers include:
Chinese Local: FAW, BAIC, BYD etc.
3. Our products have been applied to BMW, Toyata, Volkswagen, Nissan, FIAT Chrysler, GM, Mazda, Suzuki, Mitsubishi, BYD, Geely, Chery, Changan Auto, FAW group, BAIC group and other domestic and foreign MID-to-high-end vehicles.
Q5:Which countries have your parts exported to?
A5: Products are mainly exported to Japan, Malaysia, Indonesia, Thailand, USA, Argentina, Slovenia, Germany and other overseas countries.
Q6: Which in-co-term have you deal with?
A6: EXW, FOB, CIF, DAP and so on.
Q7: Can you make casting according to our drawing or samples?
Yes, we can make casting according to your drawing, 2D drawing, or 3D cad model. If the 3D cad model can be supplied, the development of the tooling can be more efficient. But without 3D, based on 2D drawing we can still make the samples properly approved.
Yes, we can do 3D scanning on your samples to get the sample 3D model and then make drawings for tooling making.