Full Automation Disposable Non Woven Slipper Making Machine

Min.Order: 1
Product origin: Dongguan, Guangdong, China
Infringement complaint: complaintComplaint
US$ 27000 ~ 29000

Description
Full Automation Disposable Hotel Slipper Making Machine





    1. Using ultrasonic to welding soles can effectively strengthen erection and hardness

     2. Using roll printing process of the rubber sheet, the pattern can be changed at any time 

     3. Available to mold proportioning, size can be customized

     4. Fully automatic production line with stable and efficient, as well reducing labor
 

    This is an equipment for producing disposable slippers. The products are widely
used in hospitals, hotels, massage places, etc. Through ultrasonic technology combined
with automatic control components, the product can realize the automatic production
of various processes.The size and shape of the product can be customized according
to special requirements.Customized and can be printed with personalized patterns to
meet different needs.It is the first choice for low-cost, high-efficiency and high-quality
production.

 

 
Machine Size6575*1000*1717mm
Output80-100 pcs/min
Voltage220 V/380 V
Power5.2 KW
Pressure0.6 Mpa
Special requirementPrinting function is optional
 

 



1)    Provide 24-hour service hotline.

2)    Reply and find out solution within the shortest time according to customer's requirement.

3)    Provide on call service to help customer solve problems.

4)    Provide free of machine installation as well as commissioning, and inform customer how
      to do the machine maintenance.

5)    Prepare customer's feedback tracking within one week after machine installation until
      meet customer's satisfaction.

6)    Provide one year guaranty and lifetime maintenance.

 

1.     Q: How is the after sales service?

        A:We provide 1 year guaranty and technical support lifetime. All machine's parts can
             be replaced for free within 1 year if broken(excluding error operation).

 

2.     Q: Is it difficult to install the machine?

        A: The work shop should prepare full facility such as power and air compressor.
              For the first installation, engineer will be sent to set machine and do the machine
              training as long as manual instruction. For the further problems come out, we can
              provide video instruction as well.

 

3.     Q: What's the machine lead time?

        A: For the standard machines, we can delivery within 30 days. If it is customized by
             customer(OEM), the lead time is 35-55 days.

Product Tag:
Related categories:
Scroll to Top