Hammer Auger Drill Rod Hydraulic Pile Driver Ramming Machine for Solar Farm

Min.Order: 1
Product origin: Xuzhou, Jiangsu, China
Infringement complaint: complaintComplaint
US$ 23999 ~ 26999

Description
 
Item
Valve
Unit
Shape size(L*W*H)
3250*2350*5000
mm
Shape size(L*W*H)
5000*2350*2300
mm
Chassis body width
1800
mm
Vehicle net weight
4500
kg
Working motor torque(max)
5700
Nm
Rotary motor torque(ground screw pilling)
4000
Nm
Rotary motor torque(auger drilling)
4000
Nm
Post length(max)
5000(standard 3500)
mm
Ground screw length
6000(standard 3500)
mm
Drilling depth
3500
mm
Ground screw depth
3500
mm
Working stroke of hydraulic hammer
700-3000
mm
Piling height
2500
mm
Drill Pipe Diameter(auger drilling)
0-300
mm
Engine power
53
KW
Diesel engine rated speed
less than or equal to 2300
r/min
Diesel engine weight
205
kg
Inclination angle of sliding guide frame
left 30/right 10
°
Front and rear adjusting angle of frame
+-10
°
Hydraulic system pressure
16-20
Mpa
Flow rate Hydraulic system
100
L/min
Walking speed
0-1600
m/h
Climbing ability
less than or equal to 30
°
Chassis spec(L*W*H)
2002*1800*520
MM
Width of steel chassis track
400
mm
Track height above the ground
230
mm
Track turn rate
1:21.4
 
Tracking working pressure difference
13
Mpa
1.It has a special structure and long service life
2.Equipped with angle digital indicator to adjust angle quickly.
3.Guard rail vertical to the ground when pilling ,can most reduce the effect of vibration on pile perpendicularity.
4.Guide rail equipped with double-row chain makes machine high safety coefficient.
5.Max stroke of hammer can reach 6 m,(standard pilling stroke height to 3.5m)
6.High control accuracy of operation valve ,Easy and smooth.
 
 
  
 
Detailed Photos

 

Company Profile

 

FAQ

1.What is the main function of our pile driver?  
Ans.: It has different models used for all kinds of PV post install, it is the best choice for solar power station construction.     
2.What is the warranty of our machine?  
Ans.:Our main machine enjoys a 1 year warranty(except for the hammer),during this time all accessories broken can be changed for a new one.And we provide videos for machine install and operation.    
3.What is the lead time and shipping method?   
Ans.:Usually the lead time is 3 days, and we send the machine by sea.    4.What kinds of payment terms do we accept? Ans.:T/T or L/C at sight...

 

 

Client feedback

If you need a pile driver machine, please contact us, this is my WhatsApp, you can also send me an inquiry, we will help you make more money.

 
 
 
 
Product Tag:
Related categories:
Scroll to Top