High quality/High cost performance Multiple Specifications Jack High Performance Machine and Equipment

Min.Order: 1
Product origin: Tianjin, China
Infringement complaint: complaintComplaint
US$ 199 ~ 599

Description

                                                         Certification


Specification

OEM

Use

1, buildings and subways, tunnels and other underground engineering deformation joints, construction joints, structural cracks plugging.

 

2, bridge pier, dam, hydropower station crack plugging, concrete structure external wall reinforcement.

 

3, all kinds of water towers, pools, basement seepage plugging.

 

4, tunnel excavation and mine construction plugging, railway, tunnel, culvert plugging.

 

5, rupture zone and soft foundation reinforcement. The waterproofing and plugging project adopts the advanced construction of "plugging, injection, sealing and prevention" measures and "grouting and waterproof coating". With advanced technology, and with my products, you will be safe.

 

6, structural cracks, small honeycomb, secondary construction joint seepage water stop leakage.

 

7, small cracks in the structure, small honeycomb, secondary construction sewing.

 

8, polyurethane blowing agent heat insulation spraying, seepage geological improvement. Such as underground railway, tunnel, continuous wall, structure and other water seepage stop leakage, basement wall water inlet geological improvement.
 

Advantage


1. Highly finished products;

 

2, simple operation;

 

3, can be four seasons construction;

 

4, non-toxic and pollution-free;

 

5. Reasonable cost.

 


RELATED PRODUCTS

 
 


FAQ

Q1: What is your MOQ?
A: Usually our MOQ is one container, but it is different for some items, please contact us for details.

Q2:What is your terms of payment?
A:We usually accept T/T at sight, L/C.
If you prefer other payments terms, please discuss.

Q3:What is your delivery time?
A:For products in stock, we can ship it within 7 days after receiving the deposit. For custom order, production time is 15-30 workdays after received the deposit.

Q4:How could you guarantee your products?
A:Mill Test Certification is supplied with shipment, We also accept and support the third-party inspection.

Q5: Will all costs be clear?
A:Our quotation is easy to understand and will not incur any additional costs.
Product Tag:
Related categories:
Scroll to Top