Brushed 316 201 Stainless Steel 3 Compartments Recycle Bins

Min.Order: 10
Product origin: Chengdu, Sichuan, China
Infringement complaint: complaintComplaint
US$ 100 ~ 250

Description
Product Descriptions
Name
OEM ODM Brushed Stainless Steel Pedal Garbage Trash Bin
Brand
God Shape
Finishing
outdoor powder coating
Color for metal
RAL colors for choosing
Screws
201,304 Stainless steel spare parts for free
Mounting method
Flange surface mounted, free standing, embedded
Production time
5-25 days after receipt of deposit
Certificate
ISO9001
Loading port
If FCL, ship from Chonqing port directly
if LCL, ship from Shanghai or Shenzhen etc
Payment term
T/T, L/C, Western Union, Money gram
ProcessingLaser cutting,  Powder Coating, Polishing, Welding, Painting & Assembly
MaterialHigh quality stainless steel of 201/304/316, galvanzied internal storage bin 
ApplicationBoth indoors and outdoors, hospitals, hotels, schools, government, real states,etc.
Volume3x35L: 78x26x75 cm
3x60L: 93x31x85 cm
3x100L: 99x33x95 cm
Or customized
CharacteristicsSelective waste sorting bin with 3 compartments and 3 pedals
Compact and space saving
Easy to clean
Does not rust with paint
Shockproof and waterproof
Packaging1. Wrapped with protective film
2. Packaged with vacuum bubble
3. Put into carton
Delivery timeBy express( DHL,FedEx,TNT,UPS etc.), 3-7days
By air, 4-7days
By ship: 20-40 days
 
 Manufacturing Process

Cutting board----- Bending----- Welding----- Polishing----- Powder Coating-----Assembling


Cutting board

Sheet metal workers in the workshop begin to cut the whole board into the required specifications according to the production drawings.

Bending

Sheet metal workers will cut the sheet, according to the specifications of the production drawings, bending the required workpiece as required.

Welding

After the bending, the welder will weld the parts prepared by the sheet metal worker according to the drawing requirements.

Polishing

After welding forming, go to the next polishing process, and the polishing worker will polish the welding spot on the welded forming workpiece smoothly.

Powder Coating

After the above procedures, the product began to take shape, and was put to the designated place for plastic spraying.

Assembling

After the production team's hard work, the product is assembled and formed, after quality inspection, packaging, warehousing.


















O&A
Q1. Are you a factory?
  A: We are a factory. We provide trash bin, mailbox, led light box, sign board and so on.

Q2. Why choose us?
  A: We offer high quality products with extremely competitive prices and timely delivery.

Q3. How do you ensure quality control?  
A: Quality is priority. We have professional QC and inspection team to check the quality after production.

Q4. How about your delivery time?
 A: It depends on your order quantity. For small or stock orders, we can deliver the goods within a week after received the payment.

Product Tag:
Related categories:
Scroll to Top