Acrel Adl3000-E/CT 3 Phase Energy Meter Modbus Demand Energy Control Meter Power Industrial Digital

Min.Order: 2
Product origin: Shanghai, China
Infringement complaint: complaintComplaint
US$ 107.8

Description
 
Product Description
ADL3000-E is a smart meter designed for power supply system, industrial and mining enterprises and utilities to calculate the electricity consumption and manage the electric demand. It features the high precision, small size and simple installation. It integrates the measurement of all electrical parameters with the comprehensive electricity metering and management provides
various data on previous 12 months, checks the 31st harmonic content and the total harmonic content, realizes the remote communication and the remote control with switching input and relay output and boasts the alarm output. It is fitted with RS485 communication port and adapted to MODBUS-RTU. ADL3000-E can be used in all kinds of control systems, SCADA systems and energy management systems. All meters meet the related technical requirements of electricity power meter in the IEC62053-21,IEC62053-22 standards.
Detailed Photos
VoltageReference voltage3*57.7/100V,3*220/380V,3*100V,3*380V
Reference frequency50Hz
Consumption<10VA(Single phase)
CurrentMaximum current6A,80A
Starting currentDirect connect:0.004lb
Connect via:0.001ln
 Consumption<1VA(Single phase rated current)
Measurement performanceAccuracyClass 0.5
Standards compliantIEC 62053-22:2003
PulsePulse width80+20ms
 Pulse constant400imp/kWh
6400imp/kWh
CommunicationInterfaceRS485
ProtocolMod bus-RTU
Temperature rangeWork-25ºC~55ºC
Storage-40ºC~70ºC
Humidity≤95%(No condensation)
Altitude<2000m


 
FAQ
Q:I bought a three-phase four-wire meter, can it be wired as three-phase three-wire?
A:Yes, press the key to set the meter to three-phase three-wire mode.
 
Q:What is the difference between ordinary secondary access and -CT (model external transformer)?
A:Ordinary secondary meter could access the ratio XXX/5(1)A of the CTs which could be actual current on site, the -CT model comes with an external transformer will be convenient for installation(It cannot be disassembled, otherwise it will burn the meter). There are CTs available on site to facilitate with No stitch removal.
 
Q:What are 3*100V,3*57.7/100V,3*380V,3*220/380V?
A:3*100V, 3*57.7/100V are used for high voltage, used in conjunction with voltage transformers, where 3*100V represents 3P3W,3*57.7V/100V represents 3P4W; 3*380V, 3*220V/380V are used for low voltage, direct voltage input, among them3*380V represents 3P3W, 3*220V/380V represents 3P4W.
 
Q:Can this meter communicate with PLC?
A:Yes, only need PLC to support RS485 interface, Modbus RTU or DL/T645 protocol.
 
Certifications

 
Packaging & Shipping

 

Company Profile

 

Product Tag:
Related categories:
Scroll to Top