300 Ton Hot Sale Horizontal PVC PPR PE Pipe Fitting Professional Making Injection Molding Machine Manufacturer

Min.Order: 1
Product origin: Suzhou, Jiangsu, China
Infringement complaint: complaintComplaint
US$ 30000 ~ 50000

Description
     
 
        





 
 
Screw diametermm606570
Screw L/D ratio L/D22.72119.5
Shot weightgram7729051050
Injection capacitycm38489951154
Injection pressureMpa207176152
Theoretical injection rate g/s 241283328
Plastic capacityg/s 35.243.351.8
Injection strokemm300
Screw torqueN.m2530
Max screw rotate speedr/min150
Clamping forceTon300
Opening strokemm590
Space between tie barsmm610×610
Mould heightmm220~630
Max daylightmm1220
Ejector forceton70.6
Ejector strokemm150
Ejector quantity 9
Oil pump motorkw30
Pump pressureMpa16
Heating powerkw22
Machine sizeM6.7*1.75*2.25
Machine weightton11
Oil tank capacityL560
International designation  3000-1750

 




 
 
 





 







 







Q1: All of your products are made by yourself or purchasing the others?
We have independent technical team who focus on making machines, all the products
are made by our technical team.

Q2: What is the ability of your factory?
About injection molding machine, we could produce 50 sets machines per month.
about blow molding machine, we could produce 30sets machine per month

Q3: Do you have any technical supports about your products?
We have had long term collaboration with our partners worldwide, and we have a lot
of cooperation with a lot hef advanced manufacture company on the world.

Q4: Does the machine have an English manual and warranty card?
Each machine has a professional English operation manual and warranty card. 
In addition, we can provide electronic version of the English manual.


Q5: Do you have an aftermarket warranty for your products?
Warranty: General one year for whole injection molding machines.
General one year for other types of whole machines.
All customers that have bought SHENZHOU injection molding machines would be provided with a lifetime repair service of the machines.


Q6: Who is responsible for the installation and debugging of the machine I purchased?
We the seller are fully responsible to send our engineers within two weeks from the date of the containers arrival to the buyers factory to commissioning the machine and training the staff of the buyer, the buyer should be responsible for a round trip economy ticket, a hotel and any other necessary accommodations for the seller's engineers, and engineer cost USD 80.00 per day.



Product Tag:
Related categories:
Scroll to Top