Life Stability Climate Test for Thermal Shock Chamber for Products Cold Hot Dealing

Min.Order: 1
Product origin: Dongguan, Guangdong, China
Infringement complaint: complaintComplaint
US$ 6000 ~ 8000

Description
Life stability climate test for thermal shock chamber for products cold hot dealing
Features:
1. The main components of the equipment (compressors, controllers, large refrigeration accessories) can provide customs declaration certificates and qualification certificates.
2. In terms of structure, the sheet materials we use are all large slabs full of 1.0, and the overall appearance is atmospheric and high-end, and the laser cutting technology we use has more advantages than the CNC machining of our peers.
3. The electrical controllers are all durable and well-known brands, and can have relevant purchase contract certificates. All wiring of the electrical panel is wired in accordance with the circuit diagram, with white wire numbers uniformly, which is more convenient for maintenance.
4. The refrigeration system increases the Danfoss automatic throttle valve, which can automatically control the size of the refrigerant flow to avoid frosting during compression at low temperatures. At the same time, the defrosting of the low temperature zone door uses the refrigeration circuit to defog, and the industry uses the heating wire to defrost. The frost is more effective and there is no maintenance rate, and once the heating wire is burned, it cannot be replaced.
5. The cylinder in-position detection function and the protection function to prevent the basket from falling off greatly increase the safety of the equipment.

 
internal volume(L)3649100150252480
SIZEBasket size: W×D×H(cm)35×30×3540×35×3540×50×5060×50×5070×60×6085×80×60
Outer size: W×D×H(cm)132×190×181137×195×181137×200×210157×200×210167×210×230177×230×230
High greenhouse10ºC→+180ºC
Heating timeHeating up +60ºC→+180ºC≤25min Note: The heating time is the performance when the high-temperature room is operated alone
Low-temperature greenhouse-60ºC→-10ºC
Cooling timeCooling +20ºC→-60ºC≤60min Note: The rising and falling time is the performance when the high-temperature greenhouse is operated alone
Temperature shock range(+60ºC±150ºC)→(-40ºC-10ºC)
performanceTemperature fluctuation±5.0ºC
Temperature deviation±2.0ºC
Temperature recovery time≤5min
Switching time≤10ses
noise≤65(db)
MaterialShell materialAnti-rust treatment cold rolled steel plate + 2688 powder coating or SUS304 stainless steel
Inner body materialStainless steel plate (US304CP type, 2B polishing treatment)
Insulation MaterialsRigid polyurethane foam (for box body), glass wool (for box door)
Cooling systemCooling methodMechanical two-stage compression refrigeration method (air-cooled condenser or water-cooled heat exchanger)
ChillerFrench "Taikang" fully hermetic compressor or German "Bitzer" semi-hermetic compressor
Compressor cooling capacity3.0HP*24.0HP*24.0HP*26.0HP*27.0HP*210.0HP*2
Electronic automatic expansion valve method or capillary methodElectronic automatic expansion valve method or capillary method
Air-cooled or water-cooledAir-cooled or water-cooled
HeaterNickel-chromium alloy electric heating wire heater
humidifierSUS316 sheathed heater (surface evaporation type)
Blower for mixing in the boxLong axis motor 375W*2 (Siemens)Long axis motor 750W*2 (Siemens)
Power Specifications 
AC380V2023.523.526.531.535
Weight (kg)500525545560700730

Product Paramenters









Our service:
During the whole business process, we offer Consultative Selling service.
1)Customer inquiry process:
Discussing testing requirements and technical details, suggested suitable products to customer to confirm. 
Then quote the most suitable price according to customer requirements.

2)Specifications customize process:
Drawing related drawings to confirm with customer for customized requirements. Offer reference photos to show the appearance of the product. Then, confirm the final solution and confirm the final price with the customer.

3)Production and delivery process:
We will produce the machines according to confirmed PO requirements. Offering photos to show the production process.
After finishing production, offer photos to the customer to confirm again with the machine. Then do own factory calibration or third party calibration(as customer requirements). Check and test all the details and then arrange packing.
Deliver the products is confirmed shipping time and inform the customer.

4)Installation and after-sale service:
Defines installing those products in the field and providing after-sales support.

FAQ:
1. Are you a Manufacturer? Do you offer after-sales service? How can I ask for that? And how about the warranty?
   Yes, we are the one of professional Manufacturers like Environmental Chambers, Leather shoe testing equipment, Plastic Rubber testing Equipment... in China. Every machine purchased from our factory has 12 months warranty after shipment. Generally, we offer 12 months for FREE maintenance. while considering sea transportation, we can extend 2 months for our customers.
    Moreover, If your machine doesn't work, you can send us an e-mail or call us we will try our best to find the problem through our conversation or by video chat if necessary. Once we have confirmed the problem, the solution will be offered within 24 to 48 hours.
 2. What about the delivery term?
 For our standard machine which means normal machines, If we have stock in the warehouse, is 3-7 working days;
 If there is no stock, normally, the delivery time is 15-20 working days after payment received;
 If you are in urgent need, we will make a special arrangement for you.
 3. Do you accept customization services? Can I have my logo on the machine?
Yes, of course. We can not only offer standard machines but also customized machines according to your requirements. And we can also put your logo on the machine which means we offer OEM and ODM service.
4. How can I install and use the machine?
Once you have ordered the testing machines from us, we will send you the operation manual or video in English version through Email.
Most of our machine is shipped with a whole part, which means it is already installed, you just need to connect the power cable and start to use it. And if it's necessary, we can also assist you to install your machine on site.

Product Tag:
Related categories:
Scroll to Top