Description
In recent years, the increased demand of the electric bus,but there is some hidden problems of the battery in the process of use, under the hot weather, the battery is easy to cause explosions due to high temperature and harm to life, and the battery under the environment of high temperature for a long time work will shorten the life of the battery.
So, the battery thermal management this concept was born, it can make the battery life is greatly increased, and at the same time the battery can be normal under the environment of high temperature of the battery can be normal operation.Product Pic
Installation mode of electric bus
Product components cooling capacity | 5kw |
Compressor displacement | 27CC/r |
evaporator air flow | 2200m3/h |
high pressure electric power | ≤15A |
low pressure electric power | ≤20A |
refrigerant | R134a |
weight | 30KG |
dimension | 770*475*339 |
suitable car model | 8~10meters bus/ light truck/ heavy truck |
Real picture of production line Jingyi Group's Vehicle Air Conditioner manufacturing equiment capacity: 6 production lines for bus and
midibus air-conditioner unite (Annual production capacity of 50000 sets).
9 production lines for all kinds of product quanlity test, with more than 130sets equipments.
Entrtprise hardware facilities manufacturing equipment level in industry-leading position,
is domestic bus air-conditioning R&D and manufacturing base.
Domestic first-class product technology testing room
Company introduction
Question& AnswerQ. 1: Are you manufactory or trade Company? We are the Manufactory specialized in air conditioning industry products for 31 years already. We have 4 bus air conditioning factories in Guangzhou, Guangdong province, China. Our factory have passed IS09001:2000, CCAP and ISO/TS 16949: 2000.Also we had latest Technical Center and quality control testing department for purchasing products for clients.Q. 2: How to control quality? A, all the raw materials by IQC (Incoming Quality Control) before launch whole process into the process after the screening.B, process each link in the process of IPQC (Input process quality control) patrol inspection.C, after finished by QC full inspection before packing into the next process packaging.D, OQC before shipment for each product to do full inspection.Q. 3: How long can I expect to get the products? The delivery time is within 15-20 days once receipt of the deposit. Q. 4: How to order? We need to know the following information for your order before sending you PI.1) Product information-Quantity, Specification (Your size of buses, model of current use of buses (if have), city bus or coach, compressor bracket assembly and alternator needs)2) Delivery time required.3) Shipping information-Company name, Street address, Phone & Fax number, Destination sea port.4) Forwarder's contact details if there's any in China.