Modern Welding Electrical Motor Winding Mechanical Steel Structure Frame Prefab Houses

Min.Order: 30
Product origin: Qingdao, Shandong, China
Infringement complaint: complaintComplaint
US$ 200 ~ 220

Description
modern welding electrical motor winding mechanical steel structure frame prefab houses 
Structure
steel structure + AAC wall panel
Life
50 years
Installation
14 - 30 days, depends on the size
Production
25-30 days, depends on the size
Customization
Accept customization, customer's design.
Transportation
Depends on the size, contact us for details
1. How long does it take to produce a constructive system?

Generally, 30 days are required to produce a villa or a steel structure building steel structure warehouse or after confirming the architectural drawing. This is indicated in the quote.

2. How many containers required for my project ?

After confirmation of your request , we send our shipping calculate weight and overall dimensions of all building materials department . After the calculation, we send you our answer.

In general, a 40-foot container is required for the transport of a building with an area of 80m2. Depends on different house.

3. What are the mandatory information to send you to get a quote?
After receiving your first inquiry, we will send you a complete array that contains all the information we need.
 
4. can you come to my country to support me in completing the house?
Yes, we can arrange an engineer to go to you country to support you at site, and train your workers. So they will know how to do for next orders.
 
5. Is the building system resistant to hurricanes and earthquakes?
Ideally , the process of construction based modular steel frames has been developed in Japan to address critical environmental conditions. The strength of steel and modular construction allow the absorption of large loads generated during disasters. Buildings withstand earthquakes of level 5-6 on the Richter scale and cyclone with sustained winds up to 40m/s.
 
Product Tag:
Related categories:
Scroll to Top