Factory Overview
Shenzhen | Jiangxi | |
Area | 10,000 Square meters | 60000 Square meters |
Employees | 300 | 900 |
Quality | 20 | 60 |
Administration | 5 | 10 |
Engnieering | 20 | 90 |
Over Sales | 10 | 20 |
Layer | 1-20 layers |
Material | FR-4,CEM-1,Aluminum base,Copper base,FR-1,CEM-3,High TG,FR4 Halogen Free, Rogers, TEFLON etc. |
Board thickness | 0.2mm-6mm(normally 1.6mm) |
Max. board size | 1200*600mm |
Finished board thickness | 0.3-5mm |
Min .drilled hole size | 0.1mm |
Min. line width | 0.1mm(4mil) |
Min. line space | 0.1mm(4mil) |
Surface finish/treatment | HASL, lead free HASL ,Immersion Gold(ENIG),Immersion Tin ,Immersion Silver, OSP, Gold plating, Gold Finger, Carbon Ink, Peelable mask |
Copper foil thickness | 18um-280um(0.5OZ-8OZ)(normally 1OZ) |
Solder mask color | green/black/white/red/blue/yellow |
Outline Tolerance | ±0.13mm |
Impedance control Tolerance | ±10% |
NPTH Hole Tolerance | ±0.075mm |
PTH Hole Tolerance | ±0.05mm |
Certificate | UL,ISO9001,ISO14001,SGS |
Profiling punching | Routing, V-CUT, Beveling |
Production capability | 720000M2/year |
Category | Q/T Lead time | Standard Lead Time | Mass Production | |||
2 Layers | 24hrs | 3-4 working days | 8-15 working days | |||
4 Layers | 48hrs | 3-5 working days | 10-15 working days | |||
6 Layers | 72hrs | 3-6 working days | 10-15 working days | |||
8 Layers | 96hrs | 3-7 working days | 14-18 working days | |||
10 Layers | 120hrs | 3-8 working days | 14-18 working days | |||
12 Layers | 120hrs | 3-9 working days | 20-26 working days | |||
14 Layers | 144hrs | 3-10 working days | 20-26 working days | |||
16-20 Layers | Depends on the specific requirements | |||||
20+ Layers | Depends on the specific requirements |