Description
EPE Foam Sheet Machine Extruder Expandable Polyethylene Plastic Machinery Manufacturer Low Density Good Cell StructureEdge And Corner Protective EPE Foam Profile Making Machine
pe foam tube is a kind of new-type foaming material and it is widely used in the installations of air conditioner sheath,pipeline heat insulation,toy guardrail,recreation places,etc.due to its good foaming,elasticity and heat preservation .
As a kind of new-type filling ornament material,pe foam rod is widely used in the stereotype,filling and ornament of spring mattress,sofa backrest and top-grade clothing.it is also widely used in the filling of contraction joint in building due to its good rebound elasticity.
m | | epe foam tube extrusion line | | | | | epe foam rod extrusion line | | | | |
type | | EPE70 | EPE75 | EPE90 | EPE105 | EPE120 | EPE70 | EPE75 | EPE90 | EPE105 | EPE120 |
extruder | | 70/50 | 75/50 | 90/50 | 105/50 | 120/50 | 70/50 | 75/50 | 90/50 | 105/50 | 120/50 |
screw speed | r/min | 5-55 | 5-50 | 5-45 | 5-40 | 5-30 | 5-55 | 5-50 | 5-45 | 5-40 | 5-30 |
foaming rate | | 20-40 | 20-40 | 20-40 | 20-40 | 20-40 | 20-40 | 20-40 | 20-40 | 20-40 | 20-40 |
spec.of product | mm | Φ10-50 | Φ10-60 | Φ20-80 | Φ20-100 | Φ20-120 | Φ6-30 | Φ6-38 | Φ6-50 | Φ10-80 | Φ10-100 |
colling method | | cooled by water and air | | | | | | | | | |
installed capacity | kw | 60 | 65 | 90 | 105 | 120 | 60 | 65 | 90 | 100 | 120 |
dimension | m | 15*1.3*1.7 | 16*1.3*1.7 | 18*1.6*1.7 | 20*1.8*1.8 | 22*1.8*1.8 | 20*1.8*1.8 | 20*1.8*1.8 | 20*1.8*1.8 | 20*1.8*1.8 | 20*1.8*1.8 |
total weight | t | 6 | 7 | 8 | 9 | 10 | 6 | 7 | 8 | 9 | 10 |
After-sale service
1. 24 hours technical support by email, call, video.
2. Warranty for one year after 12 months of shipment
3. Installation and commissioning engineer will provide the tech long machine, and machine operation of the buyer's personnel on-site training, troubleshooting and machine maintenance. The factory offers free installation training for a week the company engineers, beyond a week, the salaries borne by the customer engineer the factory.
Terms of payment
1.after receiving the deposit 40%, our company will arrange production;
2.After the customer check and accept compression machine, before delivery, customer need to pay off the balance payment;