Glass Protective Film Machine for Coating Glass /Curtain Wall

Min.Order: 1
Product origin: Jinan, Shandong, China
Infringement complaint: complaintComplaint
US$ 7200

Description
Product Description

Glass protective film coating machine is used to lay film on surface of glass. It is widely used for coating glass line and for glass of curtain wall. The machine is well designed to cover coating firmly and cut the film automatically. Double-sided laying film is high efficiant. Come without bubbles.

ModelFM1900M
NameGlass 2 Sides Laminator Machine
Applied glass Width300-1500mm
Applied glass1.3-30mm
Detailed Photos

Certifications

Our service

1). 7*24 online free technical support;

2). Design drawing of the factory workshop;

3).English manual and video tutorial

4). Skilled engineer install the machine;

5). Training workers for you;

6). Local technical support or Spare parts support,We will provide the consumable parts at an agency price
 

Company Profile

Packaging & Shipping

 

FAQ

1. Are you a manufacturer?
     Yes,we have been in providing the professional products in this field more than 20 years.
2. how to install the machine ?
     we can intrust the install the machine by vedio, email ,picture.....if large project ,
     we can arrange the worker help you to install it in your country .
3. How you pack the products ?
        Normally as the export standard packaging or as you required.
4. What is your available port of shipment?
     Qingdao port,shanghai,tianjin,guangzhou etc.
5. Is customized available ?
     Yes, according to your detailed drawings you provide
6. After Sale Service
      24 hours technical support by phone, email or skype (email or skype) . 
      12 months warranty period.
      Our senior engineer is available to travel aboard, help the installation, maintenance and training staff. 
      By offering this support, we make sure the customer start the business smoothly,
      to realize win-win cooperation
7. Are you trading company or manufacturer ?
     We are factory and welcome to visit us at any time.
8. How long is your delivery time?
      Generally single tanks need 7-15 days, for whole plant need 15-30days.
9.Do you have CE and ISO certification?
       Yes.
10.What is your terms of payment ?
       Free contact for the most suitable machine
       Free professional design for each customer especially.
        L/C, 30% deposit by T/T,70% spare payment L/C. 
        T/T, 30% deposit by T/T,70% spare payment before shipment.
        Western Union or Paypal.

Scroll to Top