The vertical mixer is used for pipe profiles, plastic building materials, plastic granulation, color masterbatch particles, recycling of recycled materials and other industries, such as plastic particles, crushed materials, plastic plates, mixing of new and old materials, etc.
The work of the vertical mixer is to lift the raw materials from the bottom of the barrel from the center to the bottom by the rapid rotation of the screw, and then scatter them in an umbrella-like manner and return to the bottom, so that the raw materials can be stirred up and down in the barrel, and a large amount of raw materials can be evenly mixed in a short time. It is mainly used for mixing plastic sheet material, crushed material, plastic granule material, new and old plastic material and added color masterbatch. It is made of stainless steel and is not easy to stick and wear.
Model | Motor power(Kw) | Max. mixing volume(Kg) | Voltage(V) | Size(mm) | Net weight(Kg) |
XY-100 | 3 | 100 | 380/three phase | 1020*1020*1280 | 180 |
XY-150 | 4 | 150 | 380/three phase | 1080*1080*1360 | 270 |
XY-200 | 5.5 | 200 | 380/three phase | 1200*1200*1460 | 313 |
XY-300 | 7.5 | 300 | 380/three phase | 1270*1270*1700 | 410 |
1. Are you factory or trading company ?
We are factory specialized in plastic machine for many years, also we have the right to export goods by ourselves.
2. Where is your factory? How can i visit your company?
Our factory is located in Ruian city,zhejiang province, China. Its about 40 minutes from shanghai by plane(4 hours by train). We will pick you up on airport or station.
Welcome to visit our factory
3. How long is your delivery time?
Normally our delivery time is 15-30 days. If you need it ugently, we can make it about7 days
4. What are your terms of payment?
We accept 30% deposit, balance before shipment. And Irrevocable L/C at sight.
5. What package do you use for the product?
Be Coated with anti-corrosion oil, and covered with plastic film, wooden box package need extra cost.
6. Does your factory provide installation service?
Our engineer can go to customer factory to installation. Customer should prepare materials used to testing the machine in advance and should be responsible for the cost of supplier's technician, including round air tickets, visa cost, accommodation and salary 100USD/Day per person since the day start out until the day arriving at factory.
7. What's your warranty policy?
12 month guarantee and whole life maintance.
8. What is your company after sale service?
We would express the free replacement parts as soon as possible.