High-Efficiency Freezing/Fresh and Delicious Ice Cream Glass Door Freezer

Min.Order: 78
Product origin: Huzhou, Zhejiang, China
Infringement complaint: complaintComplaint
US$ 135 ~ 170

Description

Product Description

 

"High-efficiency freezing, fresh and delicious: ice cream glass door freezer"
*One Piece Whole Frame(Luxury,Fashion, Elegant)
*More Space For Better Presentation
* Outside Condenser For Easy Maintenance And Better Heat Dissipation
*Unique Technology For Efficient Temperature Preservation



Use an outlet closed piston compressor unit with high refrigeration efficiency, stable performance, power saving 
and low height.

Increase the design of the evaporator and improve the heat transfer efficiency. Make the cabinet cooler faster and lower, while saving more energy.

 
Product Details

BC/BD Series

We have been committed to providing the best quality refrigeration equipment products and the best quality service, and hope that our products can bring more value and benefits to your business operations and management. We will serve you wholeheartedly and would like to establish a long-term and stable cooperative relationship with you.
 

Model No.DimensionTemperatureVoltage/Frequency40HQ Packing Quantity
SC/SD-158A
W*D*H(mm):584x695x840mm
≤ -18ºC220V/110V ,50~60hz153
SC/SD-268YW*D*H(mm):1094x598x840mm≤ -18ºC220V/110V ,50~60hz106
SC/SD-328YW*D*H(mm):1294x598x840mm≤ -18ºC220V/110V ,50~60hz78
SC/SD-388YW*D*H(mm):1260x700x850mm≤ -18ºC220V/110V ,50~60hz80
SC/SD-518Y
W*D*H(mm):1500x700x850mm
≤ -18ºC220V/110V ,50~60hz66
 

Company Profile

 



 

FAQ

(1)Q:Are you manufacturer?
A:Yes, we are manufacturer over 40 years' experience. We have three production bases, covering around 600,000 square meters.

(2)Q:Can you put my brand name (logo) on these products?  
A: Yes, we can make your logo on the products, package and instructions.

(3)Q: Do you make the testing before shipment? 
A:Yes, we have advanced testing lines, we make testing for every products before packaging.
(4)Q:What's the leading time? (How long do you need to prepare my goods?)
A:15 days for sample orders. 25-35 days for mass production orders (based on different quantities)
(5)Q:Where is your nearest Loading Ports?
A:Ningbo and Shanghai



Scroll to Top