Steel/Aluminium Greenformwork Quick Release Table Formwork Solution for Construction

Min.Order: 500
Product origin: Qingdao, Shandong, China
Infringement complaint: complaintComplaint
US$ 100 ~ 120

Description
Qingdao Scaffolding I&E Co., Ltd. and Qingdao Formwork International Co.,Ltd. are one of the biggest manufacturer in whole China for Scaffolding systems and Formwork Systems.

All our products are made as per European standard, American standard and Australian standard.

For more than 20 years, our products are widely used in the mining, construction, petrochemical and even industries all over the world:especially in whole Europe, Australia, New Zealand, U.S.A., Canada , South American countries and Southeast Asia countries.

We have opened 5 branch companies in Germany( Round GMBH),Australia (Round Scaffolding Pty Ltd.), Sweden(RILLCO),USA(Round Formwork and Scaffolding Inc),Cambodia(Round Formwork and Scaffoldings Co.,Ltd), and 5 foreign offices: In France(QingDao Scaffolding Co.,Ltd),Brazil(QingDao Scaffolding Group ),Burma(QingDao Scaffolding Group),Indonesia(QingDao Scaffolding Group),Vietnam(QingDao Scaffolding Group).




Green Formwork:
Panel - Prop early stripping Green Formwork System  -  Aluminium Formwork / Steel Formwork

Based on the concept of Green Construction,after the study of 10 years,we have developed the Panel-Propformwork system with early stripping mechanism.It is a puzzle style system which can be erected or stripped or removed with high efficiency and solid safety.It's a new invention, the most advanced Early Stripping System in the world.  We call it Green Formwork-- Panel-Prop Early Stripping System . 

It has unbeatable advantages. 
 

SAFE -The independent table with 6 directions moving restriction.It's a very stable system. 
EFFICIENT - It includes only few components, set and removal are very simple.  With early stripping mechanism,it can shorten the construction period and save your time. The erection speed is as high as 60-100 squre meters per person per day.
REDUCED TOTAL COST - Thanks to the early stripping mechanism,the number of panels becomes less and the cost,transportation and storage is reduced. 
MINIMUM OPERATORS - 3-4 workers in a team can quickly and easily set up and remove the panels.

 
There are 3 basic components in Green Formwork System,do not require braces:
 

1)Panel with plywood faced on top of a steel frame
2)Prop with early stripping mechanism
3)Assembly/Disassembly Tool

 
ItemItemspecificationunit weight
Aluminium PanelMB18121.8X1.2M43
MB1891.8X0.9M37
MB1861.8X0.6M29
MB15121.5X1.2M39.4
MB1591.5X0.9M31.3
MB1561.5X0.6M23.8
MB12121.2X1.2M32
MB1291.2X0.9M26
MB1261.2X0.6M21
MB990.9X0.9M21
MB960.9X0.6M17
MB660.6X0.6M12.3

Through the combination of panels,aux beams and bridge beam ,the system deals with complex slab structure by very simple way.
 
If you have projects in hand ,please do not hesitate to contact us.
We are committed to Excellent Services, Innovation & Quality Enhancement.





Product Tag:
Related categories:
Scroll to Top