1 Year Automatic Cleaning Blaster Factory Price Shot Blasting Equipment

Min.Order: 1
Product origin: Zhengzhou, Henan, China
Infringement complaint: complaintComplaint
US$ 8500 ~ 9000

Description
Introduce of the Shot Blaster
Mobile concrete surface shot blasting machine adopts this way to get blasting by medium (Steel shot or steel grit) to a very high speed and a certain angle to the work piece surface, this shot blasting medium can clear the work pieces' surface, and then inside the machine the medium and impurities will be recovered respectively through the vacuum cleaner air and can be reused again.

Our equipment construction is simple and convenient operation, do not need to closed road for construction, the construction cost is low, the equipment has high mobility. The machine is equipped with dust-removal unit, in the process of the construction, it can be done no dust and soilless, no pollution, and the medium can be recycled.

Dates of the Shot Blaster
Model: 550Voltage: 3-phase 380V, 50Hz, 63A
Rated input: 2*11KWOuter (machine) shell: performance index -54
Rated input: 1.1KWRated speed: 3000 rpm
Throwing head size: 220mmCement surface: ≥300m2/h
Steel plate surface: ≥80m2/hShot blasting width: 550mm
Forward speed: 0.5-20m/minDiameter of the connected vacuum tube: Φ150mm
Steel shot consumption: less than 100 g/m²Air compression power:3kw
Dust removal power: 4kwShot blasting machine size:1950*720*1130mm
Vacuum cleaner size: 1950*1030*1500mmWeight: 540KG
 

WHAT CAN SHOT BLASTING BE USED FOR?
1. To clean and prepare surfaces | such as steel, concrete and asphalt.
2. To remove top layers | like paint and epoxy.
3. To remove markings & rubber | from highways, runways, industrial floors and more.
4. To improve skid resistance | on surfaces such as sidewalks, bike paths, roads and runways.
5. To generate optical and aesthetics effects | on surfaces like roads, highways and runways.

Safe and almost dust-free
The vacuum cleaner through the three way blow back soot, using pulse valve, the use of sequence control principle, to ensure that vacuum cleaner circulation loop clear; Use the original fat gather dust hose, ensure connection wear-resisting, reliable; Use of imported filter paper, ensure dust removal effect; Make vacuum cleaner can safe, stable long-term work. 



FAQ
1. Production time:
20-40 days according to different type.

2. Installation and commissioning time:
10-15 days.

3. Installation and commissioning issue:
We will send 1-2 technicians to help with machine installation and commissioning, customer pays for their tickets, hotel and diet.

4. Warranty time:
12 months from date of commissioning completion, but no more than 18 months from date of delivery.

5. Payment term:
30% as prepayment, balance 70% before delivery or L/C at sight.

6. We supply full english documents:
including general installation drawings, pit design drawings, manual book, electric wiring diagram, electric manual book and maintenance book, etc.

Product Tag:
Related categories:
Scroll to Top