I Features:
The unit adopts 380V, three-phase, four-wire, 50Hz directly grounded AC system, voltage variation range ±5%. The power cables inside the unit shall be arranged according to the national safety standards; Main electrical components should be used in France Schneider, the United States of Bang pu and other international famous brands, the computer control system of the unit according to the change of load, automatically load or unload adjust the output of unit cooling capacity, so that the cooling capacity and the actual cooling and heat load accurately match. Make the compressor always maintain the highest efficiency, high efficiency and energy saving; Compressor start interval time is set to reduce the impact of simultaneous start on the electrical system; The control system adopts the whole Chinese display controller, can realize the remote control, with user level password and factory level password double protection function, more security.
Model | BO-10A | Unit |
The power supply | 3-50-380 | P-HZ-V |
Total power consumed | 10.3 | kw |
Maximum operating current | 19.8 | A |
Refrigerating capacity | 28.1 | kw |
Compressor power | 7.5 | kw |
Condenser fan | 1.5 | kw |
Cooling air volume | 10000 | m3/h |
Refrigerant | R407C | |
Refrigerant charge | 6 | kg |
The pump power | 1.3 | kw |
The pump flow | 5 | m3/h |
Water tank size | 180 | L |
Size of machine | 1430*790*1530 | mm |
Weight | 350 | kg |
Expansion valve | EMERSON | America |
Filter dryer | EMERSON | America |
Microcomputer controller | PUNPU | America |
The compressor | PANASONIC | Japan |
Packaging:
Stable wooden package protects machine from strike and damage.
Wound plastic film keeps machine out of damp and corrosion.
Fumigation-free package helps the smooth customs clearance.
The big size machine will be fixed in container without package.
Shipping:
For LCL, we cooperated with reputable logistics team to send machine to sea port speedily and safely.
For FCL, we get the container and do container loading by our skillful workers carefully.
For forwarders, we have professional and long-term cooperated forwarders who can handle the shipment smoothly. Also we would like
to have seamless cooperation with your forwarder at your convenience.
1. Q: What is the power supply of the machine?
A: The standard power supply in china is 380V, 3P, 50Hz. We also can customized accordingly.
2. Q: What information should the customer provide to get an accurate quotation from us?
A: The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc
3. Q: What is the payment term A: The payment term is 30% down payment, and 70% before shipment(T/T mode), we also accept other payment term, like L/C, DA, D/P etc
4. Q: What is the delivery time?
A: Normally the delivery time of the machine is 30 days after receive down payment.
5. Q: What is the warrantee period of the machine?
A: The warrantee period is one year since the date of B/L.