Hot Sale PP Concrete Fiber Reinforced Filament Production Line
China Reinforced Concrete Fiber Production Line PP Filament Extruder Making Machine is mainly used to produce PET, PP monofilament which will be used for making concrete fiber as reinforcement to concrete, mortar, plaster etc...for anti-cracking.
PP fiber can be used to replace of steel fiber to reinforce the cement concrete for crack-resistant, it has the advantage of easy dispersing blending and no need for any special maintenance.
Advantage
Technical Parameter
Item | SJ-70*33 | SJ-80*33 | SJ-90*33 |
Screw Diameter | 70mm | 80mm | 90mm |
Fiber Diameter | 0.13-0.35mm | 0.13-0.35mm | 0.13-0.35mm |
Fiber Type | PP/PE/HDPE Monofilament Yarn For Making Rope or Net | ||
Ratio of L/D | 33 | 33 | 33 |
Rotation Speed of Screw | 20-90r/min | 20-90r/min | 20-90r/min |
Drawing Ratio | 4-10 | 4-10 | 4-10 |
Cooling Mode | Water cooling | Water cooling | Water cooling |
Power Consumpstion | 100KW/65KW | 130KW/80KW | 150KW/100KW |
Max Output capacity | 1200KG/24H | 2000KG/24H | 3000KG/24H |
Machine Dimension(L*W*H) | 20*3*2.5M | 23*3*2.5M | 27*3*2.5M |
No | Description | Quantity |
1 | SJ-75/33 Single Screw Extruder | 1 set |
2 | Automatic Screen Changer | 1 set |
3 | Mold | 1 set |
4 | Water Tank Cooling System | 1 set |
5 | The first seven haul off machine | 1 set |
6 | Water heating oven | 1 set |
7 | the secend seven haul off machine | 1 set |
8 | Glazing machine | 1 set |
9 | Air oven | 1 set |
10 | the third seven rollers haul off machine | 1 set |
11 | winding machine | 1 set |
12 | shaping machine | 1 set |
13 | cutting machine | 1 set |
14 | packaing machine | 1 set |
Qingdao Trusty Plastic Machinery Company is a professional company specialize in designing and manufacturing plastic extrusion machine. We introduced and absorbed the advanced plastic processing technology, which can provide the technology and machinery one-step service.
Our company's main products are: PVC door and window profile production line, WPC wood-plastic profile production line, PVC wall panel production line, PVC/PE/PPR pipe production line, crust-foamed board production line, PE/PP/PC hollow sheet production line, PVC roof tile production line and PET packing belt production line, etc. According to customers' needs, to achieve diversified processing customization.
1.WHY CHOOSE US
We are the Professional manufacturer to develop the plastic extrusion machines in Qingdao. Machine quality and customer satisfaction is our pursuit.Be sure we have the strength to provide you with quality machines and perfect service.
2.WHAT SERVICES DO WE OFFER?
Pre-sale communication → Design proposal, signature confirmation→
Customized production→ Test machine before shipment →Package &
delivery→ Engineer installation→Training operator → Technical support
3.PAYMENT TERMS:
30% of total amount should be paid by T/T as down payment ,the balance (70% of total amount) should be paid before delivery by T/T or irrevocable L/C by payment(at sight).
4.DELIVERY CONDITIONS:
4.1 Delivery condition: FOB Qingdao port or CIF destination Port.
4.2 Delivery terms: Within 30-60 working days after receipt of advanced payment, the seller should inform the buyer to do inspection,the seller should finish packing of goods and ready for shipment within 15 working days after the seller receipt the full payment.
5.WARRANTY TERMS
5.1 Warranty period: 12 months, starting from the machine receipt in customer's warehouse
5.2 Seller shall grant: services and spare parts, free-of-charge service throughout the entire equipment during warranty period.
5.3 long life service: the seller should provide long life service for the sold goods, the buyer pay for needed spare parts after the 12months warranty terms.
6.INSPECTION
When the machine finished, the seller should inform the buyer to do inspection before shipment, the seller guaranty good performance of all the sold goods.the seller undertake the material cost for the machine inspection in seller's factory. the buyer should come to seller's factory to do the inspection work, or the buyer could entrust any third party to come to seller's factory to do the inspection work.
7.INSTALLATION AND EQUIPMENT COMMISSIONING:
if the buyer requires, the seller should send technician team to buyer's factory for installation and testing the whole line, and the buyer should undertake the whole food/place and round tickets (airplane, food, hotel, and so on), and pay salary to engineer for 100 usd/day/engineer.