Factory Direct QC Adapted Q235B Q345I S235jr Ss400b St37 St52 1010 Carbon Steel Coil ASTM A36 Hot Rolled Steel Coil Ms Coil Mild Carbon Steel for Construction

Min.Order: 1
Product origin: Liaocheng, Shandong, China
Infringement complaint: complaintComplaint
US$ 420 ~ 480

Description
Factory Direct QC Adapted Q235B Q345I S235jr Ss400b St37 St52 1010 Carbon Steel Coil ASTM A36 Hot Rolled Steel Coil Ms Coil Mild Carbon Steel for Construction
Product Description

Factory Direct QC Adapted Q235B Q345I S235jr Ss400b St37 St52 1010 Carbon Steel Coil ASTM A36 Hot Rolled Steel Coil Ms Coil Mild Carbon Steel for Construction

CertificatesAPI5L ISO 9001:2008 TUV SGS BV etcProductsCarbon Steel Coil
EdgeMill Edge / Slit EdgeMaterialQ235B, A36, Q195, SS400, st37-2, etc.
GradeASTM A36 ST37, etc.StandardASTM/EN/JIS/GB/etc. 
Mill Test CertificateAvailableThickness6-400mm
SurfaceBlack painting, Varnish painting, Anti-rust oil, Hot galvanized, cold galvanized, 3PEWidth800mm-330mm (914mm,1215mm,1250mm,1000mm the most common) or customized
PackingStandard PackagingStock or notStock
Payment termsL/C T/T (30%DEPOSIT)Coil Weight3-10 MT
ApplicationConstruction, Shipbuilding, Machinery manufacturing, Steel structure, etc. Coil Inner size508mm/610mm or customized

 

Product Parameters

 

Product Advantage

 

Packaging & Shipping

 

FAQ

1. Are1 you a manufacturer?
A:Yes, we are manufacturers. We have our own factory and our own company. I believe we will be the most suitable supplier for you.

2. Q: Do you have quality control system?
A: Yes, we have ISO, BV, MTC, certifications and our own quality control laboratory.Third party testing services are also available.

3. Q: Can we visit your factory?
A: Sure, we welcome you to visit our factory , check our production lines and know more about our strength and quality.

4. Q: Can I get some samples?
A: We are glad to provide free samples to you, but we do not offer the freight.

5. Q: What is your MOQ?
A: 1 Tons

6. Q: Can you arrange the shipment for us?
A: Yes, we have designated sea freight and railway freight forwarders with decades of experiences and we get the best price with earlist vessel and professional service.

7. Q: How long is your delivery time?
A: Generally it is 7days if we have the exact goods in our stock. If not, it will take around 15-20 days to get goods ready for delivery.

Product Tag:
Related categories:
Scroll to Top