New-Original Schnei-Der-TM221CE16r Modicon M221 PLC CPU-9 Inputs 7-Outputs Digital-Mini USB Interface

Min.Order: 1
Product origin: Shenzhen, Guangdong, China
Infringement complaint: complaintComplaint
US$ 450.86 ~ 519.47

Description

Our main focus is to provide customers with products and solutions for instrumentation, automation and optimization of industrial processes, such as: Programmable logic controller (PLS's), Variable frequency drives (VFD's), Human machine interface (HMIs), inverter/servo, relay, sensor, switch, IGBT module, power supply, connector and cable, LCD panel, fuse, button etc. 

We have committed to the automation and electrical area for 8 years with rich experience in exporting. And we offer a wide range of products of premier brands in this area:

1. Premier brands :  Sie-mens, Len-ze, Om-ron, AB, Turck, IFM, Yaskawa, Si-ck, Pi-lz, Key-ence, AB-B, Ea-ton, Fes-to, Mo-xa, Schnei-der, Phoe-nix, S-ew, Mitsu-bishi etc.


2. Brand-new, unused, unopened, undamaged item in its original packaging.

3. We are capable to provide a quick and convenient shopping experience for customers.




Product description
 
Compatible M221 I/O platform:
- Modicon TM3: Digital, Analog, Bus Expansion, Expert and Safety modules available
- Modicon TM2: Legacy Digital and Analog I/O. Available to order.

Features:
  • Intuitive machine programming with SoMachine Basic software, ready-to-use applications and function blocks

  • All embedded features and functions you need to design and build machines more profitably

  • Connected everywhere via Ethernet, wireless access, web servers to simplify machine integration and maintenance
 
 
Product Show
 







Have thousands of inverters, servos, PLCs, encoders, switches, buttons, connectors, sensors, fans, cables, Relays for frequency converter inverter machine, IGBT power module, VFD/VSD, power supply and HMIs in stock. 

Shipment: UPS, DHL, FEDEX, TNT, ARAMEX, EMS
Payment: T/T
Leadtime: some stock parts can ship out within 2days. Some is 3-5days for booking. But high power and special parts should be weeks. 

If any need, pls contact us freely.











Product Tag:
Related categories:
Scroll to Top