Skillful Manufacture Insulating Glass Production Line Price Promotion Insulating Glass Machine Equipment

Min.Order: 1
Product origin: Jinan, Shandong, China
Infringement complaint: complaintComplaint
US$ 15000 ~ 19000

Description

Insulating glass production line  is the essential machine of insulating glass produciton line, it can make stepped glass, shaped glass, double layers and three layers.
This Insulating Glass Machine is special equipment for aluminum groove type insulating glass,  it can make two-layer and three-layer insulating glasses with equal and unequal glass sheets


Technical Parameter
Max working size1800*2500mm
Min working size300*500mm
Single Glass Thickness3-12mm
Max IGU thickness 50mm
Washing speed0-8m/min
Conveyor speed45m/min
Cycle30-40 seconds(900*1200mm)
Brusher 3 paris
Brusher DiameterRough: 0.1mm, Fine: 0.06mm
Electricity power3P 380V/50HZ or 3P 220V/60HZ
Dimension15000*2500*3600mm
Water 0.5 ton per day
Air Exhaust volume0.8m3/min
Air pressure1.0Mpa
Component
ElectricityCHINT/DELIXI
Switch buttonCHINT/DELIXI
Photoelectric switchOmron,Japan
AC contactorCHINT
BreakerSchnieder
Inverter/Converter ENC
BlowerJiangsu
PU PipeJapan
BrusherAnhui
RollerAnhui
Water pumpShanghai
MotorsChengbang(Taiwai)
Machining processing(Frame,welding,mould,painting.,etc)EWORLD factory





Q: Are you manufacture?
A: Yes, we are the professional manufacture which have more than 5 workshops.

Q: How about the service?
A: 1).Reply it at once if from Ali-trade manager if by email,it reply it within 12 hour
     2).Deliver max.days within 15 days
     3).24 hours for after-sale service
     4).More than 12 years experience in this kind machine field
     5).Fluent English,communication barrier free

Q: What's the guarantee ?
A: 1).Our guarantee for 18 months.
     2).24 hour's technical support by email or calling
     3).English manual and video tutorial
     4).2 year quality guaranty for the machine(excluding the consumables)
     5).We will provide the consumable parts at an agency price
     6).24 hours on line service each day,free technical support

Q: Do you provide equipment operation training?
A: Yes.We can send professional engineers to the working site for equipment installation,adjustment,and operation training. All of our engineers have passport.

Q: If our price is higher than another company or factories ?
A: Please check what is the different of the machine parts service and guarantee,especially the machine inner electric parts.Sometimes,if machines have breakdown, the most reason is the machine inner electric parts problem, but we use the famous and reiable parts for the machines inside.

Q: How long is the delivery time ?
A: For standard machines,it would be 3-15 days; For non-standard machines and customized machines according to clients specific requirements, it would be 15 to 30 days.

Q: What is the payment?
A:  Any payment method you want, such as L/C,T/T,D/P,West-Union and so on.


Product Tag:
Related categories:
Scroll to Top