Operation specification requirements and considerations 1)Please check if the packing is complete and not broken. 2)Turn the monitor ON prior to setting up the disposable pressuretransducer system. 3)Open the disposable pressure transducer kit package using sterile technique. Verify that all connections are secure and all stopcock handles are good. Be careful to not over-tighten luer connections. 4)All side ports of stopcocks in monitoring kits are protected by vented caps which are to remain in place until the system is filled with sterile solution and dedubbled. These vented caps should always be replaced with non-vented caps provided in a separate pouch in each kit.