Steel Swivel Scaffold Solid Jack Base for Slab Support

Min.Order: 500
Product origin: Cangzhou, Hebei, China
Infringement complaint: complaintComplaint
US$ 0.5 ~ 3

Description

BS1139 Adjustable Screw Jack For Leveling Scaffolding SystemsMade from high strength steel pipes, screw jacks are equipped with
150 x 150 mm head plate to support and stabilize horizontal timber beam or steel beams in slab construction. Due to the big
supporing area, slope of up to 6 % can be achieved by the head plate.
Base plate is welded to the tubular screw stem, with a hole in each corner for securing to mudsill.
The screw jack with base plate allows your scaffold set to be leveled on uneven surfaces. Casting iron nut is used on the screw
stem, high-strength and galvanized for durability.
ACME threads are used on the screw stem.
It can fit all types of scaffolding systems, such as frames, ringlock, or cuplock systems.
Jack heads are always working in conjunction with Jack base to adjust scaffolding sets in a easy way.

Specification
Name
Type
Screw rod Dia
Screw rod thk
Height
Base plate
Adjustable Base Jack
Hollow
34/38/40/42/48
4mm
 
 
400~1200mm
120*120*4/5mm
150*150*5/6mm
Solid
26/28/30/32
_____
Adjustable U head Jack
Hollow
34/38/40/42/48
4mm
U105*100*40*4/5mm
U150*120*50*5/6mm
Solid
26/28/30/32
_____
Remark
Or customize according to your requirements
 
Detailed Photos








Certifications

Packaging & Shipping

In steel pallet ,carton, plywood case, or as your request 

Company Profile

Cangzhou Xinyue metal products Co., Ltd., was established in 2016-01-27, registered capital of 1 million yuan, enterprise address is located in Cangzhou City, Hebei Province, paper room bridge village, the industry for metal products, business scope includes: Ductile casting, hardware, scaffolding parts processing, sales, goods and technology import and export business (subject to be approved according to law, approved by the relevant departments can carry out business activities)

FAQ

Q: What's your MOQ(minimum order quantity)?

A: 1 tons at least.

2. Q: What's your packing methods?
A: Usual packed into woven bag + steel pallets or as your requirement

3. Q: What's your payment terms?
A: 30% advanced payment and balanced against copy of BL or 100% L/C at sight, or negotiate according to the order status.

4. Q: What's your delivery time?
A: About 20 days after received the advance payment or L/C.

5. Q: Are you manufacturer or trader?
A: We are the manufacturer of SCAFFOLDINGS&FORMWORK SYSTEM for many years.

 
Product Tag:
Related categories:
Scroll to Top