10-50 Tons Gold Ore Processing Plant Diamond Mining Equipment Machines

Min.Order: 1
Product origin: Ganzhou, Jiangxi, China
Infringement complaint: complaintComplaint
US$ 7899 ~ 22999

Description
10-50 Tons Gold Ore Processing Plant Diamond Mining Equipment Machines

Product Description

Gelin portable type gold & diamond washing machine provides a simple, efficient and economical solution to upgrade a wide rang of material and optimize the subsequent process steps of recovery. This method of screening helps to reduce operating and investment cost and to increase product quality, while allowing rapid and large volume processing.
It's all-in-one machine equipped with hopper+trommel screen+new saw-tooth wave jig machine+diesel engine(optional)+water pump(optional)+wheels.
Above 99% recovery ratio and large capacity,modular method makes easy to install quickly and save labor force.
Capacity and trommel size etc. are available to be customized !!

Features

1. Modular installation and turn-key operations;           
2. Mobile type with wheel can easily move to other place;           
3. Default electrical moter and optional diesel generator;           
4. Equipped with anti-skidding walkcat for standing and checking work status;           
5. Different capaciy for different customers' request;           
6. Sluice boxes available upon request at an additional cost.

Product Parameters

Gold & Diamond Wahing Plant
Item nameTechnical dataRemark
Feeding hopperGrizzly bar optional (block out the big size rocks)
TrommelDrum diameterф500/600/800/1000mmAvailable to choose
Length1000/1500/2000mmAvailable to choose
Screen Size2,3,5,6,8,10,20mmAvailable to choose
LayerSingle/Double layerAvailable to choose
Motor1.5-4 KWAvailable to choose
Jig machineCharmber shapeRectangle/Trapezoid available
Charmber area0.57-4.86m2 available according to different demand
Feeding size<30mm available according to different demand
Power3 KW1.5-7.5kw available to choose
Dimension3225mmx1550mmx2050mmother sizes available to choose
Water Pump (Optional)5-18.5 KWAvailable to choose
Sluice box (Optional)Width1000mmAvailable to choose
Length5000/6000mmAvailable to choose
Capacity5-30 TPHAvailable to choose

Detailed Photos


Operation Instruction
1.Minerals feed to the hopper of the trommel by hand or excavator;
2.Minerals go to the trommel and washed by the high pressure water;
3.The big waste gravels will be flushed to end of the trommel by water pressure and gravity;
4.Mineral under the screen size will go to Jig machine for a gravity separation (Screen size can be customized and optional);
5.The Jig machine is new saw-tooth wave jig machine, which can separate the minerals based on different specific gravity;
6.Due to the big gravity of the gold/diamond, the gold/diamond concentrate will finally separated by Jig machine

Tips: Add 1 set of sluice box or small shaking table can be recommended for a clean concentrate for the tailing.

 

Application

*Alluvial gold/diamond                                           *River sand gold/diamond     *Gravel sand gold/diamond     
*Clay deposit gold/diamond                                  *Placer gold/diamond                *Other ores with dust clay   

 

Packaging & Shipping

 

Company Profile

Ganzhou Gelin Mining Machinery Co., Ltd is an over 30 years professional manufacturer and exporter of mining machinery for crushing, screening, grinding, flotation, magnetic/gravity separation etc. in China.the machines are excellent for processing gold,diamond,iron ore, ilmenite, manganese ore etc. Gelin have a complete service system which can provide customer full service in mining field and after sales service.By now, Gelin's equipments and services are exported to over 60 countries,include America, Russia, India, Africa, Brazil, Chile,South Africa,Zambia etc. Sincerely welcome to visit our factory.

Customer Visiting
Our Services


One Stop solution for beneficiation plant service:
1.Engineering consulting available,it makes clients have a comprehensive understanding of beneficiation plant,including mine value,useful elements,mineral processing technology,plant scale,essential equipments,etc.
 
2.Arrange mineral beneficiation experiment after received the material sample and beneficiation test report will be done after test.

3.After reaching agreement with client,we start to engineering design,including planning,investigation,data collection, project evaluation etc. and then comes up with design scheme of beneficiation plant construction and working drawings.
 
4.Manufacturing the necessary equipments and arrange the shipment.
 
5.Complete services for Installation and commissioning and technical training(operating training,common problem solving training).
 
After-sale Service
Regularly visit customers to provide after- sale technical supports and to solve problems of beneficiation plant. For equipments supplied,we could provide one-year warranty and provide spare parts with preferential price in the long term and be responsible for any problems with the them.

FAQ

Q: Are you a trading company or a factory?
A: We are a factory at Shicheng county with 110 workers,6 workshops covered 17,000m2 and office covered 2,500m2. Welcome to visit our factory at anytime.
 
Q: What is your payment terms?
A: By TT(Telegraphic Transfer), 100% or 40% Deposit before production and 60% balance payment paid off before loading from factory.

Q: How long is the guarantee period of your products?
A: The guarantee period is 1-2 years, pls ask staff for more details. And we will supply lifelong technical support service and the spare parts at lowest cost.
 
Q: Is it possible to produce customized products ?
A: Yes, most of our products are produced as required.
 
Q: Is it possible to provide sample for your factory to do ore-dressing experiment?
A: Yes, engineering consulting is available and we'd like to arrange mineral beneficiation experiment after received your sample and provide the test report.

Product Tag:
Related categories:
Scroll to Top