2t Load Underground Mining Work Loader Mine Work Machinery

Min.Order: 1
Product origin: Jinan, Shandong, China
Infringement complaint: complaintComplaint
US$ 19000 ~ 22580

Description

Underground  Mining Front Loader 
Product Parameters

 

I speed10Km/h
II speed24Km/h
Bucket lift time  4.8s
Descent time 3.3s
Discharge time 1.1s
 traction force38.2KN
Pick up the powerTurning bucket48.8KN/Lift28.6KN
overall dimension (L×W×H)5672050×2310(mm)
Turning radius Outside bucket6828mm,Tires4775mm
Engine
(II)
modelYT4A2-24
typeVertical, in-line, water cooled, 4-stroke diesel engine
-NO. of cylinder-bore4-108
rated power(KW)55KW
Rotational speed(r/min)2200
min. fuel-consume ratio(km.h)242
maximum torque(N.M)285
Machine Images

 

Main Features

*Engine*:
1,A trailer engine using British Ricardo Technology, strong power, rated power of 55KW; rear dual water filter exhaust volume small;
2,The machine adopts oil filter, the filter effect is good, suitable for working in the environment with high dust density;
3,The exhaust system adopts explosion-proof type, less smoke, less pollution, low noise, good environmental protection effect, very suitable for working in the roadway or underground coal mine;
4,The cover of the engine is made of high-strength sheet metal, which is strong and durable and can effectively protect the engine from being damaged by raw coal blocks.

Torque converter:
Yj-280 single-pole three-component torque converter with high reliability and large output torque.

Transmission box:
Adopt power shift gearbox, high reliability, easy to maintain.

Fall-proof shed:
The height of the whole machine is 2.31 m, the width is 2.05 m, the middle and small coal mine laneways can pass freely, the driving shed can be simply and conveniently disassembled and assembled, after the driving shed is removed, the whole machine can be up to 1.73 m, and can be driven flexibly in the low laneways.

Lighting System:
1,Using A large-capacity battery, lighting can continue to illuminate for 4 hours, still can start the engine;
2, Lighting power up to 100W, more suitable for working in very dark environment;

Operational efficiency:
1,The rated capacity of the working bucket is 1.0 cubic meters, and the capacity of the bucket can be as high as 1.5 cubic meters when it is filled, which is very suitable for loading raw coal with shovels.
2,It can load 120 cubic meters of raw coal per hour with high working efficiency.

 

Detailed Photos



 

Workshop Show

 

 

Packaging & Shipping

 

FAQ

1, What kind of wheel loaders supply?
--- We can supply the loaders from 1ton to 6tons..

2,What is the lead time normally?
-- About 15-20days after getting the deposit money from client;

3,What is the payment terms?
-- T/T. 50% deposit in advance and 50% balance before shipment;

4,How about the shipment method?
--  Normally, it is by FCL container.

5, How about your quality control?
--We have engaged in the wheel loader field for many years, quality control is strict when producing, and will test machine after finished and make qualification report.

6, How about your warranty and after-sale service?
---The warranty for the tractor is 1 year, if any part broken within one year, we will send the parts to client by express.
If there is question about the operation or using, we will give technical support to guide client to do well.

7, Any free spare parts supply for the machine?
--- Normally, we will give extra oil and diesel fitlers for spare parts.But it depends the order quantity.

 
Product Tag:
Related categories:
Scroll to Top